IAC logo
IAC Assessment: KU0281
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0281
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1989
Principal Product ENVELOPES
NAICS n/a
SIC 2677 - Envelopes
Sales $10,000,000-$50,000,000
# of Employees 500
Plant Area (Sq.Ft.) 0
Annual Production 2,080,000 Pieces
Production Hrs. Annual 6,240
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $509,615 8,170,868 kWh $0.06
Natural Gas $84,356 21,350 MMBtu $3.95
TOTAL ENERGY COSTS $593,971
RECOMMENDED SAVINGS* $27,176 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,153
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,927
Cost:
$4,000
$14,927 239,449 - - $14,927
239,449
kWh
-
-
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$960
Cost:
$1,500
- - $960 384 -
-
kWh
$960
384
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$512
Cost:
$214
$512 8,206 - - $512
8,206
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,778
Cost:
$9,550
$6,778 108,734 - - $6,778
108,734
kWh
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,983
Cost:
$500
- - $1,983 793 -
-
kWh
$1,983
793
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,023
Cost:
$200
$1,023 16,413 - - $1,023
16,413
kWh
-
-
MMBtu
07: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$993
Cost:
-
$950 15,240 $43 17 $950
15,240
kWh
$43
17
MMBtu
TOTAL RECOMMENDED Savings:
$27,176
Cost:
$15,964
$24,190 388,042 $2,986 1,194 $24,190
388,042
kWh
$2,986
1,194
MMBtu
TOTAL IMPLEMENTED Savings:
$26,153
Cost:
$15,764
$23,167 371,629 $2,986 1,194 $23,167
371,629
kWh
$2,986
1,194
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas