IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,615

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2202 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,645 $10,782 Implemented
LE0524 # 11 Y:2022 11 2022 REPLACE BOILER $461,406 $4,000,000 Implemented
LE0524 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,133 $7,750 Implemented
LE0524 # 02 Y:2022 02 2022 PREHEAT COMBUSTION AIR WITH WASTE HEAT $131,350 $40,000 Implemented
MA0829 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,700 $4,400 Implemented
MA0829 # 06 Y:2022 06 2022 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $2,891 $4,445 Implemented
MA0829 # 07 Y:2022 07 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,594 $5,100 Implemented
LE0516 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,124 $1,200 Implemented
LE0516 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,511 $200 Implemented
LE0512 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $460,500 $3,500,000 Implemented
LE0512 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,146 $7,700 Implemented
LE0512 # 02 Y:2021 02 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,168 $4,000 Implemented
LE0512 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,383 $4,000 Implemented
SU0503 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $579 $155 Implemented
SU0503 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,396 $0 Implemented
SU0503 # 06 Y:2021 06 2021 INSTALL OCCUPANCY SENSORS $142 $176 Implemented
UF0557 # 09 Y:2020 09 2020 UPGRADE CONTROLS ON COMPRESSORS $2,548 $2,336 Implemented
UF0557 # 08 Y:2020 08 2020 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,710 $5,998 Implemented
UF0557 # 07 Y:2020 07 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,282 $25,340 Implemented
UF0557 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,870 $8,850 Implemented
UF0557 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,904 $455 Implemented
UF0557 # 03 Y:2020 03 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $33,607 $165,000 Implemented
UF0557 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,993 $25,529 Implemented
UF0557 # 01 Y:2020 01 2020 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $34,350 $150,000 Implemented
UD1025 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,051 $340 Implemented