IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2301 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $21,858 $127,920 Not Implemented
UC2301 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $552 $2,800 Not Implemented
UC2301 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $407 $600 Not Implemented
UC2301 # 06 Y:2023 06 2023 AIR CONDITION ONLY SPACE NECESSARY $1,959 $1,200 Not Implemented
UC2301 # 05 Y:2023 05 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $669 $3,250 Not Implemented
UC2301 # 01 Y:2023 01 2023 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $19,647 $0 Not Implemented
UC2301 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $520 $600 Not Implemented
MAS030 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $2,333 $4,400 Not Implemented
MAS030 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,092 $0 Implemented
MAS030 # 02 Y:2012 02 2012 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $5,241 $1,500 Not Implemented
MAS030 # 01 Y:2012 01 2012 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $8,427 $2,500 Not Implemented
MAS030 # 06 Y:2012 06 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,098 $500 Not Implemented
MAS030 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,379 $0 Implemented
MA0536 # 08 Y:2003 08 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,766 $11,500 n/a
MA0536 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,205 $11,500 n/a
MA0536 # 09 Y:2003 09 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,484 $11,500 n/a
MA0536 # 10 Y:2003 10 2003 INSULATE BARE EQUIPMENT $5,400 $2,600 Implemented
MA0536 # 11 Y:2003 11 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,456 $8,000 n/a
MA0536 # 12 Y:2003 12 2003 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $3,444 $2,250 Not Implemented
MA0536 # 13 Y:2003 13 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,072 $7,350 Not Implemented
MA0536 # 06 Y:2003 06 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $16,568 $8,480 Not Implemented
MA0536 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,935 $22,000 n/a
MA0536 # 04 Y:2003 04 2003 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $69,333 $5,900 Implemented
MA0536 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $112,689 $118,000 Implemented
MA0536 # 03 Y:2003 03 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $64,338 $60,000 Implemented