IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2306 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $336 $600 Implemented
UL2306 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $103,804 $14,859 Not Implemented
UL2306 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $30,055 $314,019 Not Implemented
UL2306 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $1,019 $0 Not Implemented
UL2306 # 03 Y:2023 03 2023 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,595 $12,891 Not Implemented
UK1704 # 11 Y:2017 11 2017 REDUCE FLUID FLOW RATES $2,428 $1,125 Not Implemented
UK1704 # 12 Y:2017 12 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $292 $775 Not Implemented
UK1704 # 10 Y:2017 10 2017 CLEAN CONDENSER TUBES $2,467 $650 Implemented
UK1704 # 09 Y:2017 09 2017 USE PHOTOCELL CONTROLS $1,262 $630 Not Implemented
UK1704 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $5,402 $8,550 Implemented
UK1704 # 07 Y:2017 07 2017 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $9,390 $9,300 Implemented
UK1704 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,756 $5,320 Implemented
UK1704 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,541 $0 Implemented
UK1704 # 04 Y:2017 04 2017 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $36,644 $16,350 Not Implemented
UK1704 # 03 Y:2017 03 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,970 $0 Implemented
UK1704 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $15,401 $43,120 Implemented
UK1704 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,480 $18,700 Implemented
UL0217 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,126 $20 Not Implemented
UL0217 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,519 $131 Not Implemented
UL0217 # 04 Y:1999 04 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $14,811 $4,765 Not Implemented
UL0217 # 03 Y:1999 03 1999 METER WASTE WATER $4,300 $0 Not Implemented
UL0215 # 03 Y:1999 03 1999 METER WASTE WATER $4,407 $2,000 Not Implemented
UL0215 # 01 Y:1999 01 1999 INSTALL TIMERS AND/OR THERMOSTATS $931 $400 Not Implemented
UL0215 # 06 Y:1999 06 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $450,000 $79,800 Not Implemented
UL0215 # 04 Y:1999 04 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,307 $8,075 Not Implemented