Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
74
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2306 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $336 | $600 | Implemented |
UL2306 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $103,804 | $14,859 | Not Implemented |
UL2306 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $30,055 | $314,019 | Not Implemented |
UL2306 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $1,019 | $0 | Not Implemented |
UL2306 # 03 Y:2023 | 03 | 2023 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,595 | $12,891 | Not Implemented |
UK1704 # 11 Y:2017 | 11 | 2017 | REDUCE FLUID FLOW RATES | $2,428 | $1,125 | Not Implemented |
UK1704 # 12 Y:2017 | 12 | 2017 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $292 | $775 | Not Implemented |
UK1704 # 10 Y:2017 | 10 | 2017 | CLEAN CONDENSER TUBES | $2,467 | $650 | Implemented |
UK1704 # 09 Y:2017 | 09 | 2017 | USE PHOTOCELL CONTROLS | $1,262 | $630 | Not Implemented |
UK1704 # 08 Y:2017 | 08 | 2017 | INSTALL OCCUPANCY SENSORS | $5,402 | $8,550 | Implemented |
UK1704 # 07 Y:2017 | 07 | 2017 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $9,390 | $9,300 | Implemented |
UK1704 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,756 | $5,320 | Implemented |
UK1704 # 05 Y:2017 | 05 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,541 | $0 | Implemented |
UK1704 # 04 Y:2017 | 04 | 2017 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $36,644 | $16,350 | Not Implemented |
UK1704 # 03 Y:2017 | 03 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $20,970 | $0 | Implemented |
UK1704 # 02 Y:2017 | 02 | 2017 | OPTIMIZE PLANT POWER FACTOR | $15,401 | $43,120 | Implemented |
UK1704 # 01 Y:2017 | 01 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,480 | $18,700 | Implemented |
UL0217 # 02 Y:1999 | 02 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,126 | $20 | Not Implemented |
UL0217 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,519 | $131 | Not Implemented |
UL0217 # 04 Y:1999 | 04 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $14,811 | $4,765 | Not Implemented |
UL0217 # 03 Y:1999 | 03 | 1999 | METER WASTE WATER | $4,300 | $0 | Not Implemented |
UL0215 # 03 Y:1999 | 03 | 1999 | METER WASTE WATER | $4,407 | $2,000 | Not Implemented |
UL0215 # 01 Y:1999 | 01 | 1999 | INSTALL TIMERS AND/OR THERMOSTATS | $931 | $400 | Not Implemented |
UL0215 # 06 Y:1999 | 06 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $450,000 | $79,800 | Not Implemented |
UL0215 # 04 Y:1999 | 04 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $4,307 | $8,075 | Not Implemented |