Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
179
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0512 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,383 | $4,000 | Implemented |
LE0512 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,086 | $1,700 | Not Implemented |
LE0512 # 05 Y:2021 | 05 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $460,500 | $3,500,000 | Implemented |
LE0512 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,146 | $7,700 | Implemented |
LE0512 # 02 Y:2021 | 02 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,168 | $4,000 | Implemented |
DL0091 # 10 Y:2012 | 10 | 2012 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,810 | $325 | Not Implemented |
DL0091 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,450 | $39,400 | Not Implemented |
DL0091 # 09 Y:2012 | 09 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,030 | $300 | Not Implemented |
DL0091 # 08 Y:2012 | 08 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $890 | $800 | Not Implemented |
DL0091 # 07 Y:2012 | 07 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,530 | $100 | Not Implemented |
DL0091 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,830 | $5,500 | Not Implemented |
DL0091 # 05 Y:2012 | 05 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,500 | $16,000 | Not Implemented |
DL0091 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,770 | $300 | Implemented |
DL0091 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,580 | $2,500 | Implemented |
DL0091 # 02 Y:2012 | 02 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,180 | $1,500 | Not Implemented |
LE0286 # 06 Y:2009 | 06 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,998 | $192 | Implemented |
LE0286 # 08 Y:2009 | 08 | 2009 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,174 | $100 | Implemented |
LE0286 # 01 Y:2009 | 01 | 2009 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $20,166 | $9,360 | Not Implemented |
LE0286 # 09 Y:2009 | 09 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,921 | $25,494 | Implemented |
LE0286 # 07 Y:2009 | 07 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,833 | $350 | Implemented |
LE0286 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,170 | $1,152 | Not Implemented |
LE0286 # 02 Y:2009 | 02 | 2009 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $15,000 | $40,000 | Not Implemented |
LE0286 # 05 Y:2009 | 05 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,022 | $800 | Not Implemented |
LE0286 # 03 Y:2009 | 03 | 2009 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $12,875 | $10,000 | Not Implemented |
LE0256 # 02 Y:2007 | 02 | 2007 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $15,602 | $5,000 | Not Implemented |