IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0503 # 02 Y:2021 02 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $30 $0 Not Implemented
SU0503 # 03 Y:2021 03 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,156 $40 Not Implemented
SU0503 # 04 Y:2021 04 2021 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $945 $340 Not Implemented
SU0503 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $579 $155 Implemented
SU0503 # 06 Y:2021 06 2021 INSTALL OCCUPANCY SENSORS $142 $176 Implemented
SU0503 # 07 Y:2021 07 2021 REDUCE VENTILATION AIR $1,358 $1,749 Not Implemented
SU0503 # 08 Y:2021 08 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $79 $186 Not Implemented
SU0503 # 09 Y:2021 09 2021 ELIMINATE/REDUCE AN OPERATION $840 $2,772 Not Implemented
UF0557 # 01 Y:2020 01 2020 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $34,350 $150,000 Implemented
UF0557 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,993 $25,529 Implemented
UF0557 # 03 Y:2020 03 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $33,607 $165,000 Implemented
UF0557 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,904 $455 Implemented
UF0557 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,870 $8,850 Implemented
UF0557 # 06 Y:2020 06 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $8,554 $38,357 Not Implemented
UF0557 # 07 Y:2020 07 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,282 $25,340 Implemented
UF0557 # 08 Y:2020 08 2020 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,710 $5,998 Implemented
UF0557 # 09 Y:2020 09 2020 UPGRADE CONTROLS ON COMPRESSORS $2,548 $2,336 Implemented
UD1025 # 01 Y:2020 01 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,747 $0 Not Implemented
UD1025 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,051 $340 Implemented
UD1025 # 03 Y:2020 03 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,411 $4,000 Not Implemented
UD1025 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $83,809 $25,133 Not Implemented
UD1025 # 05 Y:2020 05 2020 REDUCE EXCESSIVE BOILER BLOWDOWN $6,710 $5,224 Not Implemented
UD1025 # 06 Y:2020 06 2020 COMBINE UTILITY METERS $8,278 $0 Not Implemented
UD1025 # 07 Y:2020 07 2020 OPTIMIZE PLANT POWER FACTOR $3,612 $7,325 Not Implemented
UD1025 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,963 $26,366 Not Implemented