IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

371

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0124 # 04 Y:1988 04 1988 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $455 $720 Not Implemented
MA0124 # 05 Y:1988 05 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $586 $109 Implemented
MA0124 # 06 Y:1988 06 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,993 $935 Implemented
MA0124 # 07 Y:1988 07 1988 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $677 $100 Implemented
MA0124 # 08 Y:1988 08 1988 RECOVER WASTE HEAT FROM EQUIPMENT $10,065 $28,770 Not Implemented
MA0109 # 01 Y:1987 01 1987 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $346 $500 Implemented
MA0109 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $383 $87 Implemented
MA0109 # 03 Y:1987 03 1987 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,845 $31,000 Not Implemented
MA0109 # 04 Y:1987 04 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $122 $75 Implemented
MA0109 # 05 Y:1987 05 1987 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $626 $150 Not Implemented
MA0093 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,938 $785 Implemented
MA0093 # 02 Y:1987 02 1987 INSTALL SET-BACK TIMERS $3,744 $450 Not Implemented
MA0093 # 03 Y:1987 03 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $916 $250 Implemented
MA0093 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,650 $0 Implemented
MA0093 # 05 Y:1987 05 1987 UPGRADE OBSOLETE EQUIPMENT $1,429 $4,000 Not Implemented
MA0093 # 06 Y:1987 06 1987 REPAIR OR REPLACE STEAM TRAPS $940 $900 Implemented
MA0075 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $482 $300 Not Implemented
MA0075 # 02 Y:1986 02 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,147 $0 Not Implemented
MA0075 # 03 Y:1986 03 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $565 $1,136 Implemented
MA0075 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,271 $119 Implemented
MA0075 # 05 Y:1986 05 1986 IMPROVE LUBRICATION PRACTICES $1,753 $300 Not Implemented
MA0075 # 06 Y:1986 06 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $789 $800 Implemented
MA0075 # 07 Y:1986 07 1986 RECOVER WASTE HEAT FROM EQUIPMENT $1,134 $1,075 Implemented
MA0075 # 08 Y:1986 08 1986 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,014 $7,500 Implemented
MA0074 # 01 Y:1986 01 1986 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,075 $1,200 Implemented