IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0211 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,558 $3,000 Not Implemented
RU0055 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,975 $594 Not Implemented
RU0053 # 06 Y:1989 06 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $509 $168 Implemented
RU0053 # 05 Y:1989 05 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,839 $1,600 Not Implemented
RU0053 # 04 Y:1989 04 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,276 $0 Implemented
RU0053 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $970 $298 Not Implemented
RU0053 # 02 Y:1989 02 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,434 $4,320 Not Implemented
RU0053 # 01 Y:1989 01 1989 UPGRADE CONVEYORS $25,065 $45,500 Not Implemented
RU0052 # 08 Y:1989 08 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $562 $479 Not Implemented
RU0052 # 07 Y:1989 07 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,620 $0 Implemented
RU0052 # 06 Y:1989 06 1989 REDUCE VENTILATION AIR $2,959 $2,200 Not Implemented
RU0052 # 05 Y:1989 05 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,251 $4,500 Not Implemented
RU0052 # 04 Y:1989 04 1989 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $3,292 $6,000 Implemented
RU0052 # 02 Y:1989 02 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,753 $0 Not Implemented
RU0052 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,516 $2,000 Implemented
RU0055 # 02 Y:1989 02 1989 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $80,513 $66,700 Not Implemented
RU0055 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,194 $4,800 Implemented
RU0055 # 04 Y:1989 04 1989 IMPROVE LUBRICATION PRACTICES $2,844 $800 Implemented
RU0055 # 07 Y:1989 07 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,150 $3,200 Not Implemented
RU0055 # 08 Y:1989 08 1989 OPTIMIZE PLANT POWER FACTOR $31,000 $13,500 Not Implemented
RU0055 # 05 Y:1989 05 1989 RECOVER AND REUSE COOLING WATER $18,842 $0 Not Implemented
RU0055 # 06 Y:1989 06 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,303 $5,220 Implemented
RU0055 # 09 Y:1989 09 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,933 $0 Implemented
RU0055 # 10 Y:1989 10 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,364 $0 Implemented
RU0038 # 02 Y:1988 02 1988 INSTALL SET-BACK TIMERS $6,581 $0 Implemented