Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,948
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0240 # 09 Y:1995 | 09 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $330 | $500 | Implemented |
WI0230 # 01 Y:1995 | 01 | 1995 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $12,947 | $0 | Not Implemented |
WI0230 # 02 Y:1995 | 02 | 1995 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,633 | $0 | Implemented |
WI0230 # 03 Y:1995 | 03 | 1995 | INSULATE BARE EQUIPMENT | $2,042 | $2,089 | Implemented |
WI0230 # 04 Y:1995 | 04 | 1995 | INSULATE BARE EQUIPMENT | $442 | $585 | Implemented |
WI0230 # 05 Y:1995 | 05 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,124 | $500 | Implemented |
WI0230 # 06 Y:1995 | 06 | 1995 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,111 | $0 | Not Implemented |
WI0230 # 07 Y:1995 | 07 | 1995 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,098 | $0 | Implemented |
SF0051 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,721 | $1,802 | Implemented |
SF0051 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,730 | $12,058 | Implemented |
SF0051 # 03 Y:1995 | 03 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $383 | $220 | Implemented |
SF0051 # 04 Y:1995 | 04 | 1995 | REPAIR AND ELIMINATE STEAM LEAKS | $827 | $100 | Implemented |
SF0051 # 05 Y:1995 | 05 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,798 | $800 | Implemented |
SF0051 # 06 Y:1995 | 06 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,459 | $9,350 | Not Implemented |
SF0051 # 07 Y:1995 | 07 | 1995 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $377,412 | $534,700 | Not Implemented |
SF0050 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,642 | $166,900 | Implemented |
SF0050 # 02 Y:1995 | 02 | 1995 | OPTIMIZE PLANT POWER FACTOR | $3,578 | $5,911 | Not Implemented |
SF0050 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,230 | $1,125 | Implemented |
SF0050 # 04 Y:1995 | 04 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,960 | $19,510 | Not Implemented |
SF0050 # 05 Y:1995 | 05 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,254 | $748 | Not Implemented |
SF0050 # 06 Y:1995 | 06 | 1995 | REPAIR AND ELIMINATE STEAM LEAKS | $401 | $81 | Implemented |
SF0050 # 07 Y:1995 | 07 | 1995 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,773 | $25,000 | Not Implemented |
SF0050 # 08 Y:1995 | 08 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,930 | $900 | Implemented |
SF0050 # 09 Y:1995 | 09 | 1995 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $478,218 | $653,645 | Not Implemented |
OD0022 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,327 | $25,510 | Implemented |