Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1995 |
Principal Product | Corrugated Boxes |
NAICS | n/a |
SIC | 2653 - Corrugated And Solid Fiber Boxes |
Sales | $10,000,000-$50,000,000 |
# of Employees | 136 |
Plant Area (Sq.Ft.) | 231,000 |
Annual Production | 6,000,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $309,190 | 5,580,305 | kWh | $0.06 |
Natural Gas | $181,661 | 43,283 | MMBtu | $4.20 |
TOTAL ENERGY COSTS | $490,851 | |||
RECOMMENDED SAVINGS* | $51,499 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $19,123 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,790 Cost: $360 |
$1,790 | 44,256 | - | - | - | - |
$1,790 44,256 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,315 Cost: $1,122 |
$1,315 | 26,671 | - | - | - | - |
$1,315 26,671 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $3,692 Cost: $919 |
$3,692 | 74,736 | - | - | - | - |
$3,692 74,736 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $618 Cost: $680 |
$618 | 11,430 | - | - | - | - |
$618 11,430 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $9,392 Cost: $45,000 |
$(-397) | (-6,741) | $9,789 | 2,331 | - | - |
$(-397) (-6,741) kWh |
$9,789 2,331 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $1,162 Cost: - |
$1,162 | - | - | - | - | - |
$1,162 - kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7314 REDUCE VENTILATION AIR |
Savings: $21,249 Cost: $25,000 |
- | - | $21,249 | 5,059 | - | - |
- - kWh |
$21,249 5,059 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $9,347 Cost: $34,448 |
- | - | $9,347 | 2,226 | - | - |
- - kWh |
$9,347 2,226 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $2,713 Cost: $600 |
- | - | $2,713 | 646 | - | - |
- - kWh |
$2,713 646 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $200 Cost: $100 |
- | - | - | - | $200 | 15,000 |
- - kWh |
- - MMBtu |
$200 15,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $21 Cost: $100 |
- | - | - | - | $21 | 1,343 |
- - kWh |
- - MMBtu |
$21 1,343 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $51,499 Cost: $108,329 |
$8,180 | 150,352 | $43,098 | 10,262 | $221 | 16,343 | $8,180 150,352 kWh |
$43,098 10,262 MMBtu |
$221 16,343 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $19,123 Cost: $48,201 |
$6,400 | 138,922 | $12,502 | 2,977 | $221 | 16,343 | $6,400 138,922 kWh |
$12,502 2,977 MMBtu |
$221 16,343 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Solid Waste (non-haz) |