IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0197 # 06 Y:1994 06 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $473 $919 Not Implemented
AM0197 # 07 Y:1994 07 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $220 $0 Implemented
UD0419 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $19,715 $13,400 Implemented
UD0419 # 02 Y:1993 02 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $602 $0 Not Implemented
UD0419 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $3,741 $2,000 Not Implemented
UD0419 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,200 $5,739 Implemented
UD0419 # 05 Y:1993 05 1993 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $81,110 $0 Implemented
UD0419 # 06 Y:1993 06 1993 RECOVER WASTE HEAT FROM EQUIPMENT $27,720 $60,000 Not Implemented
UD0419 # 07 Y:1993 07 1993 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $89,581 $20,000 Implemented
KU0419 # 01 Y:1993 01 1993 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $167,541 $640,000 Not Implemented
KU0419 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $4,443 $2,405 Not Implemented
KU0419 # 03 Y:1993 03 1993 DIRECT WARMEST AIR TO COMBUSTION INTAKE $10,041 $15,400 Not Implemented
KU0419 # 04 Y:1993 04 1993 REPAIR AND ELIMINATE STEAM LEAKS $3,075 $750 Implemented
KU0419 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $2,124 $5,376 Not Implemented
KU0419 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,907 $201 Not Implemented
KU0419 # 07 Y:1993 07 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,428 $1,386 Implemented
ME0117 # 01 Y:1993 01 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,377 $150 Not Implemented
ME0117 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $3,110 $4,500 Not Implemented
ME0117 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $228 $100 Implemented
ME0117 # 04 Y:1993 04 1993 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $6,190 $8,500 Not Implemented
ME0117 # 05 Y:1993 05 1993 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,071 $900 Not Implemented
MO0104 # 01 Y:1993 01 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,658 $1,695 Implemented
MO0104 # 02 Y:1993 02 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $8,592 $13,864 Implemented
MO0104 # 03 Y:1993 03 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,920 $9,730 Implemented
MO0104 # 04 Y:1993 04 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,718 $704 Not Implemented