IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0264 # 02 Y:1993 02 1993 INSTALL OCCUPANCY SENSORS $3,896 $1,274 Implemented
MA0264 # 03 Y:1993 03 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,443 $1,176 Implemented
MA0264 # 04 Y:1993 04 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,451 $1,500 Implemented
MA0264 # 05 Y:1993 05 1993 REDESIGN PROCESS $457 $0 Not Implemented
MA0264 # 06 Y:1993 06 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $134 $180 Not Implemented
HO0035 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,125 $404 n/a
HO0035 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,371 $204 n/a
HO0035 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,063 $337 n/a
HO0035 # 04 Y:1993 04 1993 INSULATE BARE EQUIPMENT $130 $184 n/a
HO0035 # 05 Y:1993 05 1993 RECOVER AND REUSE COOLING WATER $24,843 $17,500 n/a
HO0035 # 06 Y:1993 06 1993 USE RADIANT HEATER FOR SPOT HEATING $3,232 $5,000 n/a
IA0044 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $22,858 $7,278 Not Implemented
IA0044 # 02 Y:1993 02 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,209 $630 Implemented
IA0044 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,777 $5,800 Implemented
IA0044 # 04 Y:1993 04 1993 INSTALL OCCUPANCY SENSORS $1,001 $864 Not Implemented
IA0044 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $739 $73 Implemented
IA0044 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $125 $240 Implemented
IA0041 # 01 Y:1992 01 1992 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $20,185 $81,000 Implemented
IA0041 # 02 Y:1992 02 1992 INSTALL TIMERS AND/OR THERMOSTATS $8,582 $3,000 Implemented
IA0041 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,582 $1,106 Implemented
IA0041 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $148 $414 Not Implemented
IA0041 # 05 Y:1992 05 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $81 $188 Implemented
IA0041 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $163 $150 Not Implemented
AM0165 # 01 Y:1992 01 1992 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $23,570 $1,350 Implemented
AM0165 # 02 Y:1992 02 1992 LOWER CEILING TO REDUCE CONDITIONED SPACE $6,300 $3,630 Implemented