IAC Assessment: ND0170
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0170
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1993
Principal Product paper
NAICS n/a
SIC 2679 - Converted Paper Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 85
Plant Area (Sq.Ft.) 195,000
Annual Production 68,000 Tons
Production Hrs. Annual 6,120
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $243,156 3,504,103 kWh $0.07
Natural Gas $17,273 4,212 MMBtu $4.10
TOTAL ENERGY COSTS $260,429
RECOMMENDED SAVINGS* $15,250 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,688
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,787
Cost:
$3,235
$2,787 40,152 - - $2,787
40,152
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,595
Cost:
$868
$3,595 46,893 - - $3,595
46,893
kWh
-
-
MMBtu
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,045
Cost:
$160
$4,045 58,324 - - $4,045
58,324
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$254
Cost:
$780
$254 1,758 - - $254
1,758
kWh
-
-
MMBtu
05: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$1,367
Cost:
$2,541
$618 8,792 $749 183 $618
8,792
kWh
$749
183
MMBtu
06: 2.5194 REDESIGN PROCESS Savings:
$261
Cost:
$80
$118 1,758 $143 35 $118
1,758
kWh
$143
35
MMBtu
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$657
Cost:
$1,700
- - $657 160 -
-
kWh
$657
160
MMBtu
08: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$307
Cost:
$4,550
- - $307 50 -
-
kWh
$307
50
MMBtu
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,133
Cost:
$400
$1,133 16,413 - - $1,133
16,413
kWh
-
-
MMBtu
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$844
Cost:
$1,200
- - $844 206 -
-
kWh
$844
206
MMBtu
TOTAL RECOMMENDED Savings:
$15,250
Cost:
$15,514
$12,550 174,090 $2,700 634 $12,550
174,090
kWh
$2,700
634
MMBtu
TOTAL IMPLEMENTED Savings:
$10,688
Cost:
$4,343
$10,545 147,127 $143 35 $10,545
147,127
kWh
$143
35
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas