Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,948
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0074 # 05 Y:1986 | 05 | 1986 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $351 | $540 | Not Implemented |
KU0206 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,289 | $5,696 | Implemented |
KU0206 # 02 Y:1986 | 02 | 1986 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,313 | $107 | Implemented |
KU0206 # 03 Y:1986 | 03 | 1986 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,935 | $1,500 | Implemented |
KU0206 # 04 Y:1986 | 04 | 1986 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,243 | $0 | Not Implemented |
KU0206 # 05 Y:1986 | 05 | 1986 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,155 | $4,000 | Not Implemented |
KU0206 # 06 Y:1986 | 06 | 1986 | IMPROVE LUBRICATION PRACTICES | $1,718 | $1,515 | Not Implemented |
KU0206 # 07 Y:1986 | 07 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $641 | $0 | Not Implemented |
KU0206 # 08 Y:1986 | 08 | 1986 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $474 | $0 | Implemented |
KU0206 # 09 Y:1986 | 09 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $979 | $0 | Not Implemented |
KU0206 # 10 Y:1986 | 10 | 1986 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $239 | $0 | Implemented |
KU0206 # 11 Y:1986 | 11 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $183 | $100 | Implemented |
KU0206 # 12 Y:1986 | 12 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $115 | $0 | Implemented |
MA0070 # 01 Y:1986 | 01 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,611 | $0 | Not Implemented |
MA0070 # 02 Y:1986 | 02 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $223 | $200 | Implemented |
MA0070 # 03 Y:1986 | 03 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,470 | $375 | Implemented |
MA0070 # 04 Y:1986 | 04 | 1986 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,575 | $5,300 | Not Implemented |
MA0070 # 05 Y:1986 | 05 | 1986 | AIR CONDITION ONLY SPACE NECESSARY | $1,072 | $2,000 | Not Implemented |
KU0205 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,437 | $2,317 | Implemented |
KU0205 # 02 Y:1986 | 02 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $3,717 | $1,000 | Implemented |
KU0205 # 03 Y:1986 | 03 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,773 | $150 | Implemented |
KU0205 # 04 Y:1986 | 04 | 1986 | IMPROVE LUBRICATION PRACTICES | $1,162 | $615 | Not Implemented |
KU0205 # 05 Y:1986 | 05 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $1,085 | $1,500 | Not Implemented |
KU0205 # 06 Y:1986 | 06 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $648 | $0 | Implemented |
KU0205 # 07 Y:1986 | 07 | 1986 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $396 | $0 | Not Implemented |