IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0612 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,865 $8,523 n/a
UF0612 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $44,735 $34,020 n/a
UF0612 # 03 Y:2024 03 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $45,994 $20,000 n/a
UF0612 # 02 Y:2024 02 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $55,068 $30,945 n/a
UF0612 # 01 Y:2024 01 2024 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $402,389 $1,529,500 n/a
WV0658 # 09 Y:2024 09 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,325 $952 Implemented
WV0658 # 08 Y:2024 08 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,674 $10,167 Not Implemented
WV0658 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,056 $7,004 Implemented
WV0658 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,787 $900 Implemented
WV0658 # 05 Y:2024 05 2024 DEVELOP A REPAIR/REPLACE POLICY $10,700 $3,650 Implemented
WV0658 # 04 Y:2024 04 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $12,305 $1,500 Implemented
WV0658 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $12,543 $934 Implemented
WV0658 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,234 $90,000 Not Implemented
WV0658 # 01 Y:2024 01 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $46,042 $4,000 Implemented
NL0092 # 01 Y:2023 01 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,092 $3,305 n/a
NL0092 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,380 $140 n/a
NL0092 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,226 $2,000 n/a
NL0092 # 04 Y:2023 04 2023 COMBINE UTILITY METERS $948 $1,000 n/a
NL0092 # 05 Y:2023 05 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $665 $1,360 n/a
NL0092 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $580 $105 n/a
UA0278 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $1,770 $1,055 n/a
UA0278 # 07 Y:2023 07 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $777 $4,000 n/a
UA0278 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,416 $8,163 n/a
UA0278 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,935 $1,000 n/a
UA0278 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,819 $1,680 n/a