IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

153

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0459 # 05 Y:2015 05 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,648 $2,700 Implemented
BD0459 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,004 $300 Implemented
BD0459 # 07 Y:2015 07 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,002 $30,399 Implemented
BD0459 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $377 $800 Implemented
BD0459 # 09 Y:2015 09 2015 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $142 $20 Implemented
BD0459 # 10 Y:2015 10 2015 USE RADIANT HEATER FOR SPOT HEATING $1,263 $3,500 Implemented
BD0459 # 11 Y:2015 11 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,826 $18 Implemented
LE0392 # 01 Y:2015 01 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,575 $0 Not Implemented
LE0392 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $3,578 $240 Not Implemented
LE0392 # 03 Y:2015 03 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,436 $700 Not Implemented
LE0392 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,170 $520 Not Implemented
LE0392 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,407 $1,210 Not Implemented
LE0392 # 06 Y:2015 06 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $887 $468 Not Implemented
LE0392 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,042 $8,300 Not Implemented
LE0392 # 08 Y:2015 08 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,703 $21,975 Not Implemented
LE0392 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $756 $1,000 Not Implemented
LE0392 # 10 Y:2015 10 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,627 $18,400 Not Implemented
LE0392 # 11 Y:2015 11 2015 INSTALL TIMERS AND/OR THERMOSTATS $1,082 $2,210 Not Implemented
LE0392 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $609 $1,733 Not Implemented
LE0392 # 13 Y:2015 13 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,472 $70,000 Not Implemented
LE0392 # 14 Y:2015 14 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,425 $10,000 Not Implemented
LE0392 # 15 Y:2015 15 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,693 $13,275 Not Implemented
OK0911 # 01 Y:2015 01 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $14,334 $41,000 Not Implemented
OK0911 # 02 Y:2015 02 2015 REPAIR AND ELIMINATE STEAM LEAKS $7,790 $400 Implemented
OK0911 # 03 Y:2015 03 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $12,634 $2,848 Implemented