IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

211

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0211 # 03 Y:2002 03 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,317 $2,352 Implemented
UM0211 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,138 $3,838 Implemented
UM0211 # 05 Y:2002 05 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $718 $100 Implemented
UM0211 # 06 Y:2002 06 2002 RECOVER WASTE HEAT FROM EQUIPMENT $543 $500 Implemented
UM0211 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $520 $375 Implemented
UM0211 # 08 Y:2002 08 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $441 $200 Not Implemented
UM0211 # 09 Y:2002 09 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $383 $600 Implemented
UM0187 # 01 Y:2001 01 2001 INSULATE BARE EQUIPMENT $6,100 $800 Not Implemented
UM0187 # 02 Y:2001 02 2001 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $4,700 $2,000 Not Implemented
UM0187 # 03 Y:2001 03 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,344 $5,200 Not Implemented
UM0187 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,181 $375 Implemented
UM0187 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,279 $1,688 Implemented
UM0187 # 06 Y:2001 06 2001 RECOVER AND REUSE COOLING WATER $10,250 $2,000 Not Implemented
UM0186 # 01 Y:2001 01 2001 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $21,500 $4,100 n/a
UM0186 # 02 Y:2001 02 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,000 $3,500 n/a
UM0186 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $7,700 $700 n/a
UM0186 # 04 Y:2001 04 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,100 $500 n/a
UM0186 # 05 Y:2001 05 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,000 $300 n/a
UM0186 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,000 $700 n/a
UM0186 # 07 Y:2001 07 2001 OPTIMIZE PLANT POWER FACTOR $1,500 $2,300 n/a
UM0186 # 08 Y:2001 08 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $500 $1,000 n/a
ND0350 # 01 Y:2000 01 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $63,400 $8,200 Not Implemented
ND0350 # 02 Y:2000 02 2000 RECYCLE WHITE WATER $36,888 $0 Not Implemented
ND0350 # 03 Y:2000 03 2000 REDUCE VENTILATION AIR $15,439 $1,000 Implemented
ND0350 # 04 Y:2000 04 2000 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,036 $20 Implemented