Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

234

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0184 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $87 $54 Not Implemented
WM0184 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $592 $0 Not Implemented
WM0184 # 01 Y:2022 01 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,492 $6,200 Not Implemented
WM0184 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $2,076 $1,190 Not Implemented
WM0184 # 03 Y:2022 03 2022 USE RADIANT HEATER FOR SPOT HEATING $1,517 $3,265 Not Implemented
WM0184 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $844 $850 Not Implemented
WM0184 # 05 Y:2022 05 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $779 $1,030 Not Implemented
WM0125 # 10 Y:2018 10 2018 INSTALL OCCUPANCY SENSORS $86 $136 Not Implemented
WM0125 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,273 $13,601 Not Implemented
WM0125 # 03 Y:2018 03 2018 USE SYNTHETIC LUBRICANT $11,015 $21,250 Not Implemented
WM0125 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,087 $2,215 Implemented
WM0125 # 02 Y:2018 02 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $17,677 $48,514 Not Implemented
WM0125 # 07 Y:2018 07 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $293 $0 Implemented
WM0125 # 09 Y:2018 09 2018 INSTALL OCCUPANCY SENSORS $200 $855 Not Implemented
WM0125 # 11 Y:2018 11 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $71 $0 Not Implemented
WM0125 # 05 Y:2018 05 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,042 $1,525 Not Implemented
WM0125 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $284 $360 Not Implemented
WM0125 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $791 $1,806 Not Implemented
WM0003 # 01 Y:2012 01 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,254 $600 Implemented
WM0003 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $137 $360 Implemented
WM0003 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $226 $120 Implemented
WM0003 # 06 Y:2012 06 2012 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $493 $99 Not Implemented
WM0003 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $2,091 $0 Not Implemented
WM0003 # 03 Y:2012 03 2012 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,223 $0 Not Implemented
WM0003 # 07 Y:2012 07 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,160 $900 Not Implemented