IAC logo
IAC Assessment: WM0003
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0003
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2012
Principal Product Industrial Absorbents
NAICS 322299 - All Other Converted Paper Product Manufacturing
SIC 2679 - Converted Paper Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 60
Plant Area (Sq.Ft.) 135,000
Annual Production 9,200,000 Pounds
Production Hrs. Annual 6,240
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $220,937 4,142,814 kWh $0.05
Electricity Demand $83,157 9,633 kW-months/year $8.63
Natural Gas $10,772 1,337 MMBtu $8.06
TOTAL ENERGY COSTS $314,866
RECOMMENDED SAVINGS* $8,584 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,617
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,254
Cost:
$600
$793 11,664 $461 54 - - - - $793
11,664
kWh
$461
54
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,091
Cost:
-
$2,091 39,945 - - - - - - $2,091
39,945
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$2,223
Cost:
-
$1,406 20,674 $817 95 - - - - $1,406
20,674
kWh
$817
95
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$226
Cost:
$120
$143 2,099 $83 10 - - - - $143
2,099
kWh
$83
10
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$137
Cost:
$360
$127 2,383 $10 1 - - - - $127
2,383
kWh
$10
1
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$493
Cost:
$99
- - - - $493 59 - - -
-
kWh
-
-
kW-months/year
$493
59
MMBtu
-
-
$
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$2,160
Cost:
$900
- - - - - - $2,160 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,160
-
$
TOTAL RECOMMENDED Savings:
$8,584
Cost:
$2,079
$4,560 76,765 $1,371 160 $493 59 $2,160 - $4,560
76,765
kWh
$1,371
160
kW-months/year
$493
59
MMBtu
$2,160
-
$
TOTAL IMPLEMENTED Savings:
$1,617
Cost:
$1,080
$1,063 16,146 $554 65 - - - - $1,063
16,146
kWh
$554
65
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product