IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CM1015 # 05 Y:2022 05 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $578 $1,310 Not Implemented
CM1015 # 04 Y:2022 04 2022 REPLACE BOILER $9,756 $43,140 Implemented
CM1015 # 03 Y:2022 03 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $30,725 $8,000 Not Implemented
CM1015 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,380 $23,925 Implemented
CM1015 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $139,944 $1,455,428 Not Implemented
UW2211 # 02 Y:2022 02 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,053 $286 Implemented
UW2211 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $708 $760 Implemented
UW2211 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,126 $6,616 Implemented
UW2211 # 01 Y:2022 01 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,539 $5,669 Implemented
UW2211 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $2,186 $1,771 Implemented
CC0007 # 09 Y:2022 09 2022 REPAIR AND ELIMINATE STEAM LEAKS $8,453 $500 n/a
CC0007 # 08 Y:2022 08 2022 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $15,506 $58,000 n/a
CC0007 # 07 Y:2022 07 2022 RECOVER WASTE HEAT FROM EQUIPMENT $10,680 $40,000 n/a
CC0007 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $3,056 $8,000 n/a
CC0007 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,005 $1,000 n/a
CC0007 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,805 $18,800 n/a
CC0007 # 03 Y:2022 03 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $364 $0 n/a
CC0007 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,936 $4,400 n/a
CC0007 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,092 $17,800 n/a
IP0162 # 01 Y:2022 01 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,109 $12 Implemented
IP0162 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,724 $1,255 Implemented
IP0162 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $377 $137 Implemented
IP0162 # 05 Y:2022 05 2022 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $45,478 $37,072 Implemented
IP0162 # 06 Y:2022 06 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,589 $8,000 Not Implemented
IP0162 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $923 $2,186 Implemented