IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

763

matching recommendations
Reset
SIC 262 Paper Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0118 # 01 Y:1988 01 1988 INSULATE BARE EQUIPMENT $4,171 $1,275 Not Implemented
MA0118 # 02 Y:1988 02 1988 REPAIR OR REPLACE STEAM TRAPS $8,138 $1,464 Implemented
MA0118 # 03 Y:1988 03 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $2,626 $930 Implemented
MA0118 # 04 Y:1988 04 1988 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $743 $990 Implemented
MA0118 # 05 Y:1988 05 1988 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $63,601 $46,000 Not Implemented
MA0118 # 06 Y:1988 06 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,658 $377 Implemented
MA0118 # 07 Y:1988 07 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,200 $340 Not Implemented
MA0118 # 08 Y:1988 08 1988 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $371,179 $670,000 Not Implemented
MA0118 # 09 Y:1988 09 1988 USE OPTIMUM THICKNESS INSULATION $2,742 $2,160 Implemented
MA0118 # 10 Y:1988 10 1988 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $14,763 $20,100 Not Implemented
AT0081 # 01 Y:1987 01 1987 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $255,410 $1,000,000 Not Implemented
AT0081 # 02 Y:1987 02 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $966 $1,074 Implemented
AT0081 # 03 Y:1987 03 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,541 $0 Implemented
AT0081 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,062 $2,365 Implemented
AT0081 # 05 Y:1987 05 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $815 $1,800 Implemented
AT0081 # 06 Y:1987 06 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,252 $6,000 Implemented
AT0081 # 07 Y:1987 07 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,796 $6,000 Implemented
AT0081 # 08 Y:1987 08 1987 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $464 $240 Implemented
KU0188 # 01 Y:1986 01 1986 IMPROVE LUBRICATION PRACTICES $13,554 $680 Not Implemented
KU0188 # 02 Y:1986 02 1986 INSTALL SET-BACK TIMERS $2,849 $248 Not Implemented
KU0188 # 03 Y:1986 03 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,183 $900 Implemented
KU0188 # 04 Y:1986 04 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $3,400 $4,600 Implemented
KU0188 # 05 Y:1986 05 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,097 $100 Not Implemented
KU0188 # 06 Y:1986 06 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $255 $0 Not Implemented
MA0033 # 01 Y:1985 01 1985 SELL COMBUSTIBLE WASTE $71,743 $0 Not Implemented