IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

742

matching recommendations
Reset
SIC 2621 Paper Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0235 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,525 $24,600 Implemented
MA0235 # 04 Y:1992 04 1992 REPAIR AND ELIMINATE STEAM LEAKS $7,975 $165 Implemented
MA0235 # 05 Y:1992 05 1992 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,141 $584 Not Implemented
MA0234 # 01 Y:1992 01 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $95,700 $153,525 Implemented
MA0234 # 02 Y:1992 02 1992 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $38,424 $77,755 Not Implemented
MA0234 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,505 $24,600 Implemented
MA0234 # 04 Y:1992 04 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $9,100 $3,720 Implemented
MA0234 # 05 Y:1992 05 1992 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,845 $4,162 Not Implemented
MA0234 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $562 $0 Not Implemented
CO0220 # 01 Y:1991 01 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,430 $250 Implemented
CO0220 # 02 Y:1991 02 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,430 $50 Implemented
CO0220 # 03 Y:1991 03 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,945 $500 Implemented
CO0220 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,322 $1,300 Implemented
CO0220 # 05 Y:1991 05 1991 REPAIR AND ELIMINATE STEAM LEAKS $3,455 $500 Implemented
CO0220 # 06 Y:1991 06 1991 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $4,542 $1,000 Implemented
CO0220 # 07 Y:1991 07 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $2,934 $2,648 Implemented
CO0220 # 08 Y:1991 08 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,746 $10,692 Implemented
CO0220 # 09 Y:1991 09 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,044 $31,984 Implemented
MA0199 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $29,260 $96,000 Not Implemented
MA0199 # 02 Y:1990 02 1990 INSULATE FEEDWATER TANK $1,053 $352 Implemented
MA0199 # 03 Y:1990 03 1990 INSULATE BARE EQUIPMENT $147 $118 Not Implemented
MA0199 # 04 Y:1990 04 1990 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $19,829 $22,178 Implemented
MA0199 # 05 Y:1990 05 1990 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,282 $200 Not Implemented
MA0199 # 06 Y:1990 06 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,992 $21,942 Not Implemented
MA0199 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,137 $3,492 Implemented