IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 2631 Paperboard Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0986 # 03 Y:2018 03 2018 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $698 $356 Not Implemented
OK0986 # 13 Y:2018 13 2018 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $634,282 $3,891,600 Not Implemented
OK0986 # 12 Y:2018 12 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $99,065 $85,003 Implemented
OK0986 # 11 Y:2018 11 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $357 $183 Not Implemented
OK0986 # 10 Y:2018 10 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $546 $1,200 Not Implemented
OK0986 # 09 Y:2018 09 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,714 $381 Not Implemented
OK0986 # 08 Y:2018 08 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,819 $4,198 Implemented
OK0986 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,208 $4,556 Implemented
OK0986 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $893 $6,038 Implemented
OK0986 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $552 $1,402 Implemented
OK0986 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,941 $16,934 Implemented
OK0986 # 02 Y:2018 02 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $28,456 $4,000 Implemented
OK0986 # 01 Y:2018 01 2018 REPAIR AND ELIMINATE STEAM LEAKS $107,913 $4,800 Implemented
KU0344 # 01 Y:1991 01 1991 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,104 $9,500 Not Implemented
KU0344 # 08 Y:1991 08 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,696 $5,700 Not Implemented
KU0344 # 07 Y:1991 07 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,036 $973 Not Implemented
KU0344 # 06 Y:1991 06 1991 INSULATE BARE EQUIPMENT $16,731 $15,811 Not Implemented
KU0344 # 05 Y:1991 05 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,057 $1,200 Not Implemented
KU0344 # 04 Y:1991 04 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $385 $285 Not Implemented
KU0344 # 03 Y:1991 03 1991 OPTIMIZE PLANT POWER FACTOR $9,087 $19,000 Not Implemented
KU0344 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $13,421 $150,000 Not Implemented