Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
219
matching recommendationsSIC | 265 | Paperboard Containers And Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0218 # 06 Y:2023 | 06 | 2023 | INSTALL SET-BACK TIMERS | $473 | $1,000 | Not Implemented |
DL0218 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,159 | $10,000 | Implemented |
DL0218 # 04 Y:2023 | 04 | 2023 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $10,992 | $10,000 | Not Implemented |
DL0218 # 03 Y:2023 | 03 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $3,402 | $750 | Implemented |
DL0218 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $90,882 | $0 | Implemented |
DL0218 # 01 Y:2023 | 01 | 2023 | REDUCE VENTILATION AIR | $11,809 | $0 | Implemented |
DL0150 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,920 | $500 | Not Implemented |
DL0150 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,720 | $18,100 | Not Implemented |
DL0150 # 06 Y:2015 | 06 | 2015 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $13,240 | $62,400 | Not Implemented |
DL0150 # 05 Y:2015 | 05 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,075 | $19,740 | Not Implemented |
DL0150 # 04 Y:2015 | 04 | 2015 | INSTALL REPLACEMENT DOORS | $2,450 | $7,800 | Not Implemented |
DL0150 # 03 Y:2015 | 03 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $760 | $560 | Not Implemented |
DL0150 # 01 Y:2015 | 01 | 2015 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $780 | $0 | Not Implemented |
DL0150 # 08 Y:2015 | 08 | 2015 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $7,020 | $58,500 | Not Implemented |
LE0397 # 04 Y:2015 | 04 | 2015 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,238 | $5,500 | Not Implemented |
LE0397 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,085 | $4,300 | Not Implemented |
LE0397 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $116 | $1,914 | Implemented |
LE0397 # 05 Y:2015 | 05 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,917 | $14,900 | Not Implemented |
LE0397 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,396 | $1,000 | Implemented |
LE0397 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,221 | $10,086 | Implemented |
LE0336 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,762 | $25 | Implemented |
LE0336 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,734 | $8,000 | Implemented |
LE0336 # 06 Y:2012 | 06 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,840 | $3,000 | Implemented |
LE0336 # 09 Y:2012 | 09 | 2012 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $2,523 | $2,500 | Not Implemented |
LE0336 # 10 Y:2012 | 10 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $576 | $840 | Not Implemented |