IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,551

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0406 # 02 Y:2008 02 2008 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,257 $1,026 Not Implemented
SD0406 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,830 $3,110 Implemented
SD0406 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,339 $6,365 Implemented
SD0406 # 05 Y:2008 05 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,294 $1,477 Implemented
UW0006 # 01 Y:2007 01 2007 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $29,806 $4,759 Not Implemented
UW0006 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,096 $1,900 Implemented
UW0006 # 03 Y:2007 03 2007 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $6,191 $10,550 Not Implemented
UW0006 # 04 Y:2007 04 2007 OPTIMIZE PLANT POWER FACTOR $3,834 $12,330 Not Implemented
UW0006 # 05 Y:2007 05 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,403 $4,470 Implemented
UW0006 # 06 Y:2007 06 2007 INSTALL OCCUPANCY SENSORS $2,289 $3,340 Implemented
UW0006 # 07 Y:2007 07 2007 USE SOLAR HEAT TO HEAT WATER $1,600 $4,450 Not Implemented
UW0006 # 08 Y:2007 08 2007 DEVELOP A REPAIR/REPLACE POLICY $1,318 $597 Implemented
UW0006 # 09 Y:2007 09 2007 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $987 $1,725 Not Implemented
GT0836 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,543 $3,750 Implemented
GT0836 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,785 $6,280 Implemented
GT0836 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $9,709 $600 Implemented
GT0836 # 04 Y:2007 04 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,640 $51,790 Not Implemented
GT0836 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,676 $5,730 Not Implemented
GT0836 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $239,330 $464,160 Not Implemented
GT0836 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,938 $54,630 Implemented
GT0836 # 08 Y:2007 08 2007 INSTALL OCCUPANCY SENSORS $11,122 $22,750 Not Implemented
LE0257 # 01 Y:2007 01 2007 USE OPTIMUM TEMPERATURE $14,693 $3,500 Implemented
LE0257 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,241 $10,000 Not Implemented
LE0257 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,861 $6,000 Not Implemented
LE0257 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,031 $0 Implemented