Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,551
matching recommendationsSIC | 265 | Paperboard Containers And Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0227 # 01 Y:2006 | 01 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $101,579 | $40,000 | Not Implemented |
LE0227 # 02 Y:2006 | 02 | 2006 | REPLACE BOILER | $39,147 | $143,000 | Not Implemented |
LE0227 # 03 Y:2006 | 03 | 2006 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $18,895 | $42,000 | Not Implemented |
LE0227 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,727 | $1,000 | Not Implemented |
LE0227 # 05 Y:2006 | 05 | 2006 | INSTALL BACK-UP EQUIPMENT | $8,000 | $7,900 | Not Implemented |
LE0227 # 06 Y:2006 | 06 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,005 | $500 | Not Implemented |
LE0227 # 07 Y:2006 | 07 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,617 | $1,200 | Not Implemented |
UU0097 # 06 Y:2006 | 06 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $2,770 | $1,500 | Not Implemented |
UU0097 # 07 Y:2006 | 07 | 2006 | INSTALL COMMON HEADER ON COMPRESSORS | $1,960 | $2,900 | Not Implemented |
UU0097 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,113 | $3,570 | Not Implemented |
UU0097 # 09 Y:2006 | 09 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $71,588 | $180,000 | Not Implemented |
UU0097 # 01 Y:2006 | 01 | 2006 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $58,512 | $25,405 | Not Implemented |
UU0097 # 02 Y:2006 | 02 | 2006 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $177,372 | $808,858 | Not Implemented |
UU0097 # 03 Y:2006 | 03 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,790 | $2,000 | Not Implemented |
UU0097 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,461 | $4,840 | Not Implemented |
UU0097 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,191 | $740 | Not Implemented |
AM0501 # 01 Y:2006 | 01 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $13,010 | $390 | Implemented |
AM0501 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,130 | $105 | Implemented |
AM0501 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,800 | $6,380 | Not Implemented |
AM0501 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,370 | $500 | Implemented |
AM0501 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,370 | $1,000 | Implemented |
AM0501 # 06 Y:2006 | 06 | 2006 | USE SYNTHETIC LUBRICANT | $650 | $0 | Not Implemented |
TA0108 # 01 Y:2005 | 01 | 2005 | OPTIMIZE PLANT POWER FACTOR | $11,100 | $22,000 | Not Implemented |
TA0108 # 02 Y:2005 | 02 | 2005 | INSULATE BARE EQUIPMENT | $2,910 | $495 | Implemented |
TA0108 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,647 | $120 | Implemented |