Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,551
matching recommendationsSIC | 265 | Paperboard Containers And Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0051 # 06 Y:1995 | 06 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,459 | $9,350 | Not Implemented |
SF0051 # 07 Y:1995 | 07 | 1995 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $377,412 | $534,700 | Not Implemented |
SF0050 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,642 | $166,900 | Implemented |
SF0050 # 02 Y:1995 | 02 | 1995 | OPTIMIZE PLANT POWER FACTOR | $3,578 | $5,911 | Not Implemented |
SF0050 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,230 | $1,125 | Implemented |
SF0050 # 04 Y:1995 | 04 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,960 | $19,510 | Not Implemented |
SF0050 # 05 Y:1995 | 05 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,254 | $748 | Not Implemented |
SF0050 # 06 Y:1995 | 06 | 1995 | REPAIR AND ELIMINATE STEAM LEAKS | $401 | $81 | Implemented |
SF0050 # 07 Y:1995 | 07 | 1995 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,773 | $25,000 | Not Implemented |
SF0050 # 08 Y:1995 | 08 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,930 | $900 | Implemented |
SF0050 # 09 Y:1995 | 09 | 1995 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $478,218 | $653,645 | Not Implemented |
SD0108 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,729 | $4,910 | Implemented |
SD0108 # 02 Y:1995 | 02 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,762 | $14,570 | Not Implemented |
SD0108 # 03 Y:1995 | 03 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $938 | $920 | Not Implemented |
SD0108 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,423 | $45,026 | Not Implemented |
SD0108 # 05 Y:1995 | 05 | 1995 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,269 | $3,995 | Not Implemented |
SD0108 # 06 Y:1995 | 06 | 1995 | INSTALL OCCUPANCY SENSORS | $833 | $1,026 | Not Implemented |
SD0108 # 07 Y:1995 | 07 | 1995 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $23,250 | $2,000 | Not Implemented |
UM0020 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $445 | $747 | Implemented |
UM0020 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,545 | $6,937 | Implemented |
UM0020 # 03 Y:1995 | 03 | 1995 | ADD AREA LIGHTING SWITCHES | $5,032 | $2,000 | Implemented |
UM0020 # 04 Y:1995 | 04 | 1995 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $411 | $356 | Implemented |
UM0020 # 05 Y:1995 | 05 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,280 | $180 | Implemented |
UM0020 # 06 Y:1995 | 06 | 1995 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $144 | $200 | Implemented |
OK0454 # 01 Y:1995 | 01 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,534 | $180 | Implemented |