IAC logo
IAC Assessment: SF0051
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0051
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1995
Principal Product Corrugated Cartons
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 370,000
Annual Production 680 Thousand Feet
Production Hrs. Annual 6,864
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $558,421 6,570,926 kWh $0.08
Natural Gas $179,562 53,845 MMBtu $3.33
TOTAL ENERGY COSTS $737,983
RECOMMENDED SAVINGS* $392,330 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,459
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,721
Cost:
$1,802
$1,721 20,223 - - $1,721
20,223
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,730
Cost:
$12,058
$4,730 55,686 - - $4,730
55,686
kWh
-
-
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$383
Cost:
$220
- - $383 115 -
-
kWh
$383
115
MMBtu
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$827
Cost:
$100
- - $827 248 -
-
kWh
$827
248
MMBtu
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,798
Cost:
$800
- - $1,798 540 -
-
kWh
$1,798
540
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,459
Cost:
$9,350
- - $5,459 1,685 -
-
kWh
$5,459
1,685
MMBtu
07: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$377,412
Cost:
$534,700
$521,921 6,177,902 $(-144,509) (-43,331) $521,921
6,177,902
kWh
$(-144,509)
(-43,331)
MMBtu
TOTAL RECOMMENDED Savings:
$392,330
Cost:
$559,030
$528,372 6,253,811 $(-136,042) (-40,743) $528,372
6,253,811
kWh
$(-136,042)
(-40,743)
MMBtu
TOTAL IMPLEMENTED Savings:
$9,459
Cost:
$14,980
$6,451 75,909 $3,008 903 $6,451
75,909
kWh
$3,008
903
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas