IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0217 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,519 $131 Not Implemented
UL0217 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,126 $20 Not Implemented
UL0217 # 03 Y:1999 03 1999 METER WASTE WATER $4,300 $0 Not Implemented
UL0217 # 04 Y:1999 04 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $14,811 $4,765 Not Implemented
UL0215 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $759 $1,452 Implemented
UL0215 # 01 Y:1999 01 1999 INSTALL TIMERS AND/OR THERMOSTATS $931 $400 Not Implemented
UL0215 # 04 Y:1999 04 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,307 $8,075 Not Implemented
UL0215 # 05 Y:1999 05 1999 INCREASE USE OF AUTOMATION $21,820 $100,000 Implemented
UL0215 # 03 Y:1999 03 1999 METER WASTE WATER $4,407 $2,000 Not Implemented
UL0215 # 06 Y:1999 06 1999 $450,000 $79,800 Not Implemented
UL0185 # 06 Y:1997 06 1997 BURN WOOD BY-PRODUCTS FOR HEAT $625 $0 Not Implemented
UL0185 # 05 Y:1997 05 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $23,580 $4,040 Not Implemented
UL0185 # 04 Y:1997 04 1997 INSTALL TIMERS AND/OR THERMOSTATS $1,320 $2,600 Not Implemented
UL0185 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $677 $20 Implemented
UL0185 # 02 Y:1997 02 1997 OPTIMIZE PLANT POWER FACTOR $6,333 $6,499 Not Implemented
UL0185 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $266 $7,360 Implemented
UL0185 # 07 Y:1997 07 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,707 $0 Not Implemented
UL0144 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $375 $854 n/a
UL0144 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $444 $170 n/a
UL0144 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $993 $40 n/a
UL0144 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $366 $20 n/a
UL0144 # 01 Y:1995 01 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,436 $2,000 n/a
UL0143 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,522 $20 n/a
UL0143 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,980 $40 n/a
UL0143 # 03 Y:1995 03 1995 OPTIMIZE PLANT POWER FACTOR $20,656 $19,584 n/a