IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0209 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,912 $32,046 Implemented
ME0209 # 11 Y:1997 11 1997 MINIMIZE WATER USAGE $222 $110 Not Implemented
ME0209 # 10 Y:1997 10 1997 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $36,223 $200,000 Implemented
ME0209 # 09 Y:1997 09 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $432 $91 Implemented
ME0209 # 08 Y:1997 08 1997 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $662 $0 Not Implemented
ME0209 # 07 Y:1997 07 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $930 $30 Not Implemented
ME0209 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,024 $0 Implemented
ME0209 # 05 Y:1997 05 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,583 $486 Not Implemented
ME0209 # 04 Y:1997 04 1997 INSULATE BARE EQUIPMENT $5,853 $925 Implemented
ME0209 # 03 Y:1997 03 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,434 $1,980 Not Implemented
ME0209 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,155 $8,223 Not Implemented
ME0145 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $642 $550 Not Implemented
ME0145 # 03 Y:1994 03 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $827 $85 Not Implemented
ME0145 # 02 Y:1994 02 1994 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,471 $800 Not Implemented
ME0145 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,797 $300 Implemented
ME0117 # 01 Y:1993 01 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,377 $150 Not Implemented
ME0117 # 05 Y:1993 05 1993 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,071 $900 Not Implemented
ME0117 # 04 Y:1993 04 1993 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $6,190 $8,500 Not Implemented
ME0117 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $228 $100 Implemented
ME0117 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $3,110 $4,500 Not Implemented