IAC Assessment: ME0209
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1997
Principal Product cardboard containers
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 165,000
Annual Production 650,000,000 Thousand Feet
Production Hrs. Annual 6,860
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $201,859 3,558,910 kWh $0.06
Electricity Demand $89,044 11,594 kW-months/year $7.68
Electricity Fees $121 - $ -
Natural Gas $116,891 30,772 MMBtu $3.80
LPG $12,832 1,538 MMBtu $8.34
Fuel Oil #2 $15,946 3,795 MMBtu $4.20
TOTAL ENERGY COSTS $453,711
RECOMMENDED SAVINGS* $99,430 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $62,444
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ lb $ $ $ $ $ Tgal
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$25,155
Cost:
$8,223
$20,160 335,873 $11,059 1,440 $(-3,389) (-891) $(-2,675) (-637) - - - - - - - - - - $20,160
335,873
kWh
$11,059
1,440
kW-months/year
$(-3,389)
(-891)
MMBtu
$(-2,675)
(-637)
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,912
Cost:
$32,046
$14,551 242,380 $3,361 437 - - - - - - - - - - - - - - $14,551
242,380
kWh
$3,361
437
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,434
Cost:
$1,980
$7,434 123,974 - - - - - - - - - - - - - - - - $7,434
123,974
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,853
Cost:
$925
$5,853 97,597 - - - - - - - - - - - - - - - - $5,853
97,597
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,583
Cost:
$486
$2,583 43,083 - - - - - - - - - - - - - - - - $2,583
43,083
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,024
Cost:
-
$2,024 33,705 - - - - - - - - - - - - - - - - $2,024
33,705
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$930
Cost:
$30
$930 15,533 - - - - - - - - - - - - - - - - $930
15,533
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
08: 2.7291 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS Savings:
$662
Cost:
-
$524 8,792 $138 18 - - - - - - - - - - - - - - $524
8,792
kWh
$138
18
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$432
Cost:
$91
$432 26,671 - - - - - - - - - - - - - - - - $432
26,671
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
10: 3.1193 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING Savings:
$36,223
Cost:
$200,000
- - - - - - - - - - $443 18,200 $28,500 - $7,280 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$443
18,200
lb
$28,500
-
$
$7,280
-
$
-
-
Tgal
11: 3.4151 MINIMIZE WATER USAGE Savings:
$222
Cost:
$110
- - - - - - - - $185 26,000 - - - - - - $37 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$185
26,000
Tgal
-
-
lb
-
-
$
-
-
$
$37
-
Tgal
TOTAL RECOMMENDED Savings:
$99,430
Cost:
$243,891
$54,491 927,608 $14,558 1,895 $(-3,389) (-891) $(-2,675) (-637) $185 26,000 $443 18,200 $28,500 - $7,280 - $37 - $54,491
927,608
kWh
$14,558
1,895
kW-months/year
$(-3,389)
(-891)
MMBtu
$(-2,675)
(-637)
MMBtu
$185
26,000
Tgal
$443
18,200
lb
$28,500
-
$
$7,280
-
$
$37
-
Tgal
TOTAL IMPLEMENTED Savings:
$62,444
Cost:
$233,062
$22,860 400,353 $3,361 437 - - - - - - $443 18,200 $28,500 - $7,280 - - - $22,860
400,353
kWh
$3,361
437
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$443
18,200
lb
$28,500
-
$
$7,280
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ lb $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Water Consumption