Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 265 | Paperboard Containers And Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0688 # 02 Y:2017 | 02 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,221 | $180,000 | Implemented |
OR0688 # 01 Y:2017 | 01 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,431 | $448 | Implemented |
OR0688 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,049 | $0 | Not Implemented |
OR0688 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,165 | $0 | Not Implemented |
OR0675 # 04 Y:2016 | 04 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,199 | $7,215 | Not Implemented |
OR0675 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,809 | $23,810 | Implemented |
OR0675 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,062 | $1,969 | Implemented |
OR0675 # 01 Y:2016 | 01 | 2016 | INSTALL EQUIPMENT TO MOVE PRODUCT | $79,123 | $89,654 | Implemented |
UW0046 # 01 Y:2011 | 01 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $44,504 | $330 | Not Implemented |
UW0046 # 03 Y:2011 | 03 | 2011 | INSTALL OCCUPANCY SENSORS | $1,735 | $1,160 | Not Implemented |
UW0046 # 02 Y:2011 | 02 | 2011 | REPLACE BOILER | $38,030 | $90,000 | Not Implemented |
UW0027 # 01 Y:2009 | 01 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,632 | $10,324 | Not Implemented |
UW0027 # 02 Y:2009 | 02 | 2009 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,650 | $37,000 | Not Implemented |
UW0027 # 03 Y:2009 | 03 | 2009 | INSULATE BARE EQUIPMENT | $5,716 | $871 | Not Implemented |
UW0027 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,168 | $2,280 | Implemented |
UW0027 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $144 | $0 | Implemented |
UW0006 # 09 Y:2007 | 09 | 2007 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $987 | $1,725 | Not Implemented |
UW0006 # 01 Y:2007 | 01 | 2007 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $29,806 | $4,759 | Not Implemented |
UW0006 # 08 Y:2007 | 08 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $1,318 | $597 | Implemented |
UW0006 # 07 Y:2007 | 07 | 2007 | USE SOLAR HEAT TO HEAT WATER | $1,600 | $4,450 | Not Implemented |
UW0006 # 06 Y:2007 | 06 | 2007 | INSTALL OCCUPANCY SENSORS | $2,289 | $3,340 | Implemented |
UW0006 # 05 Y:2007 | 05 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,403 | $4,470 | Implemented |
UW0006 # 04 Y:2007 | 04 | 2007 | OPTIMIZE PLANT POWER FACTOR | $3,834 | $12,330 | Not Implemented |
UW0006 # 03 Y:2007 | 03 | 2007 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $6,191 | $10,550 | Not Implemented |
UW0006 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,096 | $1,900 | Implemented |