IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 2652 Setup Paperboard Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0218 # 06 Y:2023 06 2023 INSTALL SET-BACK TIMERS $473 $1,000 Not Implemented
DL0218 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $11,159 $10,000 Implemented
DL0218 # 04 Y:2023 04 2023 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $10,992 $10,000 Not Implemented
DL0218 # 03 Y:2023 03 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,402 $750 Implemented
DL0218 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $90,882 $0 Implemented
DL0218 # 01 Y:2023 01 2023 REDUCE VENTILATION AIR $11,809 $0 Implemented
DL0150 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,920 $500 Not Implemented
DL0150 # 01 Y:2015 01 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $780 $0 Not Implemented
DL0150 # 08 Y:2015 08 2015 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $7,020 $58,500 Not Implemented
DL0150 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,720 $18,100 Not Implemented
DL0150 # 06 Y:2015 06 2015 LOWER CEILING TO REDUCE CONDITIONED SPACE $13,240 $62,400 Not Implemented
DL0150 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,075 $19,740 Not Implemented
DL0150 # 04 Y:2015 04 2015 INSTALL REPLACEMENT DOORS $2,450 $7,800 Not Implemented
DL0150 # 03 Y:2015 03 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $760 $560 Not Implemented
LE0257 # 08 Y:2007 08 2007 INSTALL OCCUPANCY SENSORS $1,047 $150 Implemented
LE0257 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,008 $5,752 Not Implemented
LE0257 # 06 Y:2007 06 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $641 $2,000 Not Implemented
LE0257 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $661 $800 Not Implemented
LE0257 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,031 $0 Implemented
LE0257 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,861 $6,000 Not Implemented
LE0257 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,241 $10,000 Not Implemented
LE0257 # 01 Y:2007 01 2007 USE OPTIMUM TEMPERATURE $14,693 $3,500 Implemented
LE0229 # 09 Y:2006 09 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,780 $1,000 Implemented
LE0229 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $5,318 $525 Not Implemented
LE0229 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,100 $4,218 Not Implemented