IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,168

matching recommendations
Reset
SIC 2653 Corrugated And Solid Fiber Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0334 # 10 Y:2013 10 2013 REPLACE BOILER $945 $4,440 Implemented
SU0334 # 07 Y:2013 07 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $212 $393 Implemented
SU0334 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $464 $170 Implemented
SU0334 # 05 Y:2013 05 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $831 $307 Implemented
SU0334 # 04 Y:2013 04 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $555 $139 Implemented
SU0334 # 03 Y:2013 03 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $648 $0 Implemented
SU0334 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $799 $0 Implemented
LE0336 # 01 Y:2012 01 2012 INSTALL TIMERS AND/OR THERMOSTATS $18,760 $150 Implemented
LE0336 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,173 $1,000 Implemented
LE0336 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,242 $16,000 Implemented
LE0336 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,734 $8,000 Implemented
LE0336 # 06 Y:2012 06 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,840 $3,000 Implemented
LE0336 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,762 $25 Implemented
LE0336 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,616 $650 Implemented
BD0391 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $738 $1,000 Implemented
BD0391 # 04 Y:2011 04 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,808 $11,500 Implemented
BD0391 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,439 $7,923 Implemented
BD0391 # 01 Y:2011 01 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $29,184 $2,500 Implemented
LL0343 # 01 Y:2011 01 2011 REPAIR AND ELIMINATE STEAM LEAKS $106,373 $5,110 Implemented
LL0343 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $81,368 $27,800 Implemented
LL0343 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $5,155 $2,526 Implemented
LL0343 # 05 Y:2011 05 2011 INSTALL SPECTRAL REFLECTORS / DELAMP $320 $455 Implemented
LL0343 # 07 Y:2011 07 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $363 $225 Implemented
IC0176 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,067 $1,035 Implemented
IC0176 # 07 Y:2010 07 2010 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,677 $40,071 Implemented