IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

109

matching recommendations
Reset
SIC 2653 Corrugated And Solid Fiber Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0050 # 04 Y:1995 04 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,960 $19,510 Not Implemented
SF0050 # 05 Y:1995 05 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $1,254 $748 Not Implemented
SF0050 # 06 Y:1995 06 1995 REPAIR AND ELIMINATE STEAM LEAKS $401 $81 Implemented
SF0050 # 07 Y:1995 07 1995 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,773 $25,000 Not Implemented
SF0050 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,930 $900 Implemented
SF0050 # 09 Y:1995 09 1995 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $478,218 $653,645 Not Implemented
UM0020 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $445 $747 Implemented
UM0020 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,545 $6,937 Implemented
UM0020 # 03 Y:1995 03 1995 ADD AREA LIGHTING SWITCHES $5,032 $2,000 Implemented
UM0020 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $411 $356 Implemented
UM0020 # 05 Y:1995 05 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $1,280 $180 Implemented
UM0020 # 06 Y:1995 06 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $144 $200 Implemented
OK0454 # 01 Y:1995 01 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,534 $180 Implemented
OK0454 # 02 Y:1995 02 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $23,979 $0 Implemented
OK0454 # 03 Y:1995 03 1995 INSTALL SET-BACK TIMERS $767 $1,663 Not Implemented
OK0454 # 04 Y:1995 04 1995 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,628 $351 Not Implemented
OK0454 # 05 Y:1995 05 1995 INSTALL OCCUPANCY SENSORS $3,811 $1,996 Implemented
OK0454 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,468 $16,443 Implemented
OK0454 # 07 Y:1995 07 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,701 $14,986 Implemented
KG0016 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,950 $20,870 Implemented
KG0016 # 02 Y:1995 02 1995 INSTALL TIMERS AND/OR THERMOSTATS $7,434 $1,200 Implemented
KG0016 # 03 Y:1995 03 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,593 $2,685 Not Implemented
KG0016 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,727 $882 Implemented
KG0016 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,255 $15 Not Implemented
KG0016 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $1,857 $178 Not Implemented