IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 2653 Corrugated And Solid Fiber Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0195 # 02 Y:2004 02 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $29,156 $14,088 Not Implemented
LE0195 # 03 Y:2004 03 2004 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $33,048 $40,000 Not Implemented
LE0195 # 04 Y:2004 04 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $19,946 $48,000 Implemented
LE0195 # 05 Y:2004 05 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $16,168 $6,683 Implemented
LE0195 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,604 $40,000 Not Implemented
LE0195 # 07 Y:2004 07 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,095 $0 Implemented
LE0195 # 08 Y:2004 08 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $5,089 $0 Implemented
LE0195 # 09 Y:2004 09 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,529 $12,960 Not Implemented
LE0195 # 10 Y:2004 10 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,299 $1,200 Implemented
LE0195 # 11 Y:2004 11 2004 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $960 $200 Implemented
LE0195 # 01 Y:2004 01 2004 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $575,674 $984,000 Not Implemented
RU0142 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $222 $0 Implemented
RU0142 # 04 Y:1992 04 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,143 $0 Not Implemented
RU0142 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,812 $0 Not Implemented
RU0142 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,151 $0 Not Implemented
RU0142 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,782 $0 Not Implemented
RU0134 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,270 $0 Not Implemented
RU0134 # 02 Y:1991 02 1991 IMPROVE LUBRICATION PRACTICES $3,946 $800 Not Implemented
RU0134 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,703 $4,024 Not Implemented
RU0134 # 04 Y:1991 04 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,468 $500 Not Implemented
RU0134 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $4,234 $0 Not Implemented
RU0098 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,642 $0 Implemented
RU0098 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,589 $196 Implemented
RU0098 # 03 Y:1990 03 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,134 $302 Not Implemented
RU0098 # 04 Y:1990 04 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,244 $0 Implemented