Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
109
matching recommendationsSIC | 2653 | Corrugated And Solid Fiber Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL0144 # 03 Y:1995 | 03 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $444 | $170 | n/a |
UL0144 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $375 | $854 | n/a |
UL0144 # 04 Y:1995 | 04 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $993 | $40 | n/a |
UL0144 # 05 Y:1995 | 05 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $366 | $20 | n/a |
UL0144 # 01 Y:1995 | 01 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,436 | $2,000 | n/a |
UL0143 # 04 Y:1995 | 04 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,980 | $40 | n/a |
UL0143 # 05 Y:1995 | 05 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,522 | $20 | n/a |
UL0143 # 03 Y:1995 | 03 | 1995 | OPTIMIZE PLANT POWER FACTOR | $20,656 | $19,584 | n/a |
UL0143 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $957 | $1,539 | n/a |
UL0143 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,882 | $5,564 | n/a |
UD0477 # 02 Y:1995 | 02 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,045 | $4,000 | Implemented |
UD0477 # 06 Y:1995 | 06 | 1995 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,150 | $250 | Implemented |
UD0477 # 05 Y:1995 | 05 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,196 | $21,000 | Implemented |
UD0477 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,867 | $5,759 | Implemented |
UD0477 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,444 | $4,300 | Implemented |
UD0477 # 08 Y:1995 | 08 | 1995 | RECOVER AND REUSE COOLING WATER | $10,234 | $2,500 | Not Implemented |
UD0477 # 01 Y:1995 | 01 | 1995 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $1,927 | $0 | Implemented |
UD0477 # 07 Y:1995 | 07 | 1995 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $1,625 | $600 | Not Implemented |
UD0477 # 09 Y:1995 | 09 | 1995 | RECOVER AND REUSE COOLING WATER | $16,375 | $7,500 | Implemented |
NV0041 # 03 Y:1995 | 03 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $259 | $843 | Not Implemented |
NV0041 # 04 Y:1995 | 04 | 1995 | INSULATE BARE EQUIPMENT | $692 | $361 | Not Implemented |
NV0041 # 02 Y:1995 | 02 | 1995 | INSULATE BARE EQUIPMENT | $4,791 | $1,203 | Not Implemented |
NV0041 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,423 | $489 | Implemented |
UL0138 # 06 Y:1995 | 06 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,170 | $60 | Not Implemented |
UL0138 # 05 Y:1995 | 05 | 1995 | OPTIMIZE PLANT POWER FACTOR | $4,224 | $3,600 | Not Implemented |