IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 2656 Sanitary Food Containers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0248 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,837 $14,800 Implemented
SD0248 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,887 $4,950 Implemented
SD0248 # 09 Y:2000 09 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,397 $8,500 Implemented
SD0248 # 11 Y:2000 11 2000 $13,426 $11,836 Implemented
SD0248 # 07 Y:2000 07 2000 $11,600 $1,000 Implemented
SD0248 # 06 Y:2000 06 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $5,300 $12,500 Not Implemented
SD0248 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,585 $0 Implemented
SD0248 # 08 Y:2000 08 2000 $743 $800 Not Implemented
SD0248 # 03 Y:2000 03 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,532 $7,536 Implemented
SD0248 # 10 Y:2000 10 2000 $70,500 $120,000 Not Implemented
SD0248 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $31,001 $40,000 Not Implemented
SD0080 # 21 Y:1994 21 1994 INSTALL OCCUPANCY SENSORS $2,522 $1,560 Not Implemented
SD0080 # 23 Y:1994 23 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,110 $525 Implemented
SD0080 # 20 Y:1994 20 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,244 $1,562 Implemented
SD0080 # 19 Y:1994 19 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $55,146 $34,528 Implemented
SD0080 # 18 Y:1994 18 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,934 $16,383 Implemented
SD0080 # 14 Y:1994 14 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $1,019 $439 Implemented
SD0080 # 13 Y:1994 13 1994 INSULATE BARE EQUIPMENT $2,600 $226 Implemented
SD0080 # 12 Y:1994 12 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $5,003 $250 Implemented
SD0080 # 11 Y:1994 11 1994 USE POWER DURING OFF-PEAK PERIODS $12,571 $0 Implemented
SD0080 # 09 Y:1994 09 1994 REPAIR AND ELIMINATE STEAM LEAKS $13,168 $4,000 Implemented
SD0080 # 08 Y:1994 08 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,743 $10,500 Not Implemented
SD0080 # 06 Y:1994 06 1994 REPAIR AND ELIMINATE STEAM LEAKS $8,391 $300 Implemented
SD0080 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,021 $220 Implemented
SD0080 # 03 Y:1994 03 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,204 $300 Implemented