Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsSIC | 2657 | Folding Paperboard Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0662 # 10 Y:2025 | 10 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $167,076 | $0 | n/a |
SD0662 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,422 | $2,278 | n/a |
SD0662 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,646 | $15,968 | n/a |
SD0662 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $78,473 | $158,282 | n/a |
SD0662 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $291,442 | $26,842 | n/a |
SD0662 # 03 Y:2025 | 03 | 2025 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $1,617 | $2,200 | n/a |
SD0662 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $40,111 | $7,839 | n/a |
SD0662 # 05 Y:2025 | 05 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,635 | $3,345 | n/a |
SD0662 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,545 | $8,505 | n/a |
SD0662 # 07 Y:2025 | 07 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $30,392 | $3,600 | n/a |
SF0438 # 11 Y:2013 | 11 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,005 | $10,308 | Not Implemented |
SF0438 # 09 Y:2013 | 09 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $799 | $2,008 | Not Implemented |
SF0438 # 02 Y:2013 | 02 | 2013 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $4,345 | $2,494 | Implemented |
SF0438 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,414 | $840 | Implemented |
SF0438 # 04 Y:2013 | 04 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $176 | $105 | Implemented |
SF0438 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,090 | $4,441 | Implemented |
SF0438 # 06 Y:2013 | 06 | 2013 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $4,153 | $5,267 | Implemented |
SF0438 # 05 Y:2013 | 05 | 2013 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $3,906 | $4,995 | Implemented |
SF0438 # 07 Y:2013 | 07 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,126 | $11,332 | Not Implemented |
SF0438 # 08 Y:2013 | 08 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,281 | $7,509 | Not Implemented |
SF0438 # 10 Y:2013 | 10 | 2013 | INSTALL OCCUPANCY SENSORS | $2,748 | $8,715 | Not Implemented |
SF0375 # 10 Y:2009 | 10 | 2009 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $9,983 | $67,481 | Implemented |
SF0375 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $75,147 | $244,092 | Implemented |
SF0375 # 03 Y:2009 | 03 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $34,176 | $37,453 | Not Implemented |
SF0375 # 05 Y:2009 | 05 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,172 | $3,307 | Not Implemented |