Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 2657 | Folding Paperboard Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0438 # 07 Y:2013 | 07 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,126 | $11,332 | Not Implemented |
SF0438 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,414 | $840 | Implemented |
SF0438 # 11 Y:2013 | 11 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,005 | $10,308 | Not Implemented |
SF0438 # 10 Y:2013 | 10 | 2013 | INSTALL OCCUPANCY SENSORS | $2,748 | $8,715 | Not Implemented |
SF0438 # 09 Y:2013 | 09 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $799 | $2,008 | Not Implemented |
SF0438 # 08 Y:2013 | 08 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,281 | $7,509 | Not Implemented |
SF0438 # 02 Y:2013 | 02 | 2013 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $4,345 | $2,494 | Implemented |
SF0438 # 04 Y:2013 | 04 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $176 | $105 | Implemented |
SF0438 # 05 Y:2013 | 05 | 2013 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $3,906 | $4,995 | Implemented |
SF0438 # 06 Y:2013 | 06 | 2013 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $4,153 | $5,267 | Implemented |
SF0438 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,090 | $4,441 | Implemented |
SF0375 # 03 Y:2009 | 03 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $34,176 | $37,453 | Not Implemented |
SF0375 # 10 Y:2009 | 10 | 2009 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $9,983 | $67,481 | Implemented |
SF0375 # 09 Y:2009 | 09 | 2009 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,842 | $12,018 | Implemented |
SF0375 # 08 Y:2009 | 08 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $191 | $945 | Not Implemented |
SF0375 # 07 Y:2009 | 07 | 2009 | INSTALL OCCUPANCY SENSORS | $10,418 | $41,832 | Implemented |
SF0375 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $75,147 | $244,092 | Implemented |
SF0375 # 05 Y:2009 | 05 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,172 | $3,307 | Not Implemented |
SF0375 # 04 Y:2009 | 04 | 2009 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $26,893 | $32,381 | Not Implemented |
SF0375 # 02 Y:2009 | 02 | 2009 | INSULATE BARE EQUIPMENT | $2,383 | $460 | Implemented |
SF0375 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,246 | $0 | Implemented |
SF0026 # 09 Y:1994 | 09 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,858 | $900 | Implemented |
SF0026 # 08 Y:1994 | 08 | 1994 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,146 | $6,550 | Not Implemented |
SF0026 # 07 Y:1994 | 07 | 1994 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $273 | $500 | Not Implemented |
SF0026 # 06 Y:1994 | 06 | 1994 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,853 | $400 | Implemented |