IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,398

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0459 # 05 Y:2015 05 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,648 $2,700 Implemented
BD0459 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,004 $300 Implemented
BD0459 # 07 Y:2015 07 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,002 $30,399 Implemented
BD0459 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $377 $800 Implemented
BD0459 # 09 Y:2015 09 2015 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $142 $20 Implemented
BD0459 # 10 Y:2015 10 2015 USE RADIANT HEATER FOR SPOT HEATING $1,263 $3,500 Implemented
BD0459 # 11 Y:2015 11 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,826 $18 Implemented
BD0449 # 01 Y:2014 01 2014 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $64,237 $1,500,000 Implemented
BD0449 # 03 Y:2014 03 2014 USE PHOTOCELL CONTROLS $12,784 $7,575 Implemented
BD0449 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,491 $20 Implemented
BD0449 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,827 $2,800 Implemented
LE0383 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,489 $40 Implemented
LE0383 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,539 $300 Implemented
NC0519 # 01 Y:2014 01 2014 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $207,427 $102,000 Implemented
NC0519 # 03 Y:2014 03 2014 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $104,811 $52,500 Implemented
NC0519 # 04 Y:2014 04 2014 REPAIR AND ELIMINATE STEAM LEAKS $21,819 $2,200 Implemented
NC0519 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $67,692 $258,028 Implemented
NC0519 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,850 $500 Implemented
MZ0147 # 01 Y:2014 01 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $871 $360 Implemented
MZ0147 # 02 Y:2014 02 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $63 $235 Implemented
MZ0147 # 03 Y:2014 03 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $63 $235 Implemented
MZ0147 # 04 Y:2014 04 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $423 $470 Implemented
MZ0147 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,562 $42,645 Implemented
MZ0147 # 06 Y:2014 06 2014 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,184 $600 Implemented
MZ0147 # 09 Y:2014 09 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,212 $420 Implemented