IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

122

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0557 # 07 Y:2020 07 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,282 $25,340 Implemented
UF0557 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,904 $455 Implemented
UF0557 # 03 Y:2020 03 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $33,607 $165,000 Implemented
UF0557 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,993 $25,529 Implemented
UF0557 # 01 Y:2020 01 2020 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $34,350 $150,000 Implemented
UF0557 # 08 Y:2020 08 2020 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,710 $5,998 Implemented
UF0557 # 09 Y:2020 09 2020 UPGRADE CONTROLS ON COMPRESSORS $2,548 $2,336 Implemented
UF0557 # 06 Y:2020 06 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $8,554 $38,357 Not Implemented
UF0557 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,870 $8,850 Implemented
MI0288 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,619 $3,040 Not Implemented
MI0288 # 08 Y:2015 08 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,441 $3,140 Not Implemented
MI0288 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,939 $91,936 Implemented
MI0288 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $11,915 $1,856 Not Implemented
MI0288 # 09 Y:2015 09 2015 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $3,903 $5,740 Not Implemented
MI0288 # 11 Y:2015 11 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,333 $80 Implemented
MI0288 # 10 Y:2015 10 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $2,706 $1,300 Implemented
MI0288 # 13 Y:2015 13 2015 INSTALL SKYLIGHTS $830 $2,100 Not Implemented
MI0288 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,388 $40 Implemented
MI0288 # 07 Y:2015 07 2015 USE OPTIMUM THICKNESS INSULATION $5,040 $1,810 Not Implemented
MI0288 # 05 Y:2015 05 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,547 $280 Not Implemented
MI0288 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,212 $1,670 Implemented
MI0288 # 04 Y:2015 04 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,840 $4,691 Implemented
MI0224 # 09 Y:2012 09 2012 INSTALL SKYLIGHTS $1,608 $5,550 Not Implemented
MI0224 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $1,962 $520 Implemented
MI0224 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,668 $80 Implemented