IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,112

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0141 # 08 Y:1992 08 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,137 $1,280 Not Implemented
WI0141 # 09 Y:1992 09 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,087 $0 Not Implemented
WI0141 # 10 Y:1992 10 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $471 $0 Not Implemented
WI0141 # 11 Y:1992 11 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,202 $2,292 Implemented
WI0141 # 12 Y:1992 12 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $305 $500 Not Implemented
WI0141 # 13 Y:1992 13 1992 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $316 $200 Not Implemented
RU0136 # 01 Y:1992 01 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,772 $0 Implemented
RU0136 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,508 $8,097 Not Implemented
RU0136 # 03 Y:1992 03 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $498 $152 Not Implemented
RU0136 # 04 Y:1992 04 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,771 $30 Implemented
RU0136 # 05 Y:1992 05 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,803 $500 Not Implemented
MA0231 # 01 Y:1992 01 1992 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $95,745 $229,893 Not Implemented
MA0231 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,364 $30,000 Not Implemented
MA0231 # 03 Y:1992 03 1992 INSULATE BARE EQUIPMENT $5,409 $2,790 Not Implemented
MA0231 # 04 Y:1992 04 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $3,499 $11,534 Not Implemented
MA0231 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,256 $36 Implemented
MA0231 # 06 Y:1992 06 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,652 $20,657 Not Implemented
MA0231 # 07 Y:1992 07 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,000 $0 Implemented
MA0231 # 08 Y:1992 08 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,209 $11,204 Not Implemented
MA0231 # 09 Y:1992 09 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $318 $740 Not Implemented
WI0129 # 01 Y:1991 01 1991 INSTALL AUTOMATIC STACK DAMPER $3,952 $5,600 Not Implemented
WI0129 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,522 $0 Not Implemented
WI0129 # 03 Y:1991 03 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,859 $0 Not Implemented
WI0129 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,215 $1,280 Not Implemented
WI0129 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $770 $238 Not Implemented