IAC Assessment: CO0253
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1992
Principal Product Pressure-Sensitive Tapes
NAICS n/a
SIC 2672 - Paper Coated And Laminated, Nec
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 400,000
Annual Production 3,500,000 Pieces
Production Hrs. Annual 8,688
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $756,018 16,283,998 kWh $0.05
Natural Gas $337,002 149,779 MMBtu $2.25
TOTAL ENERGY COSTS $1,093,020
RECOMMENDED SAVINGS* $58,930 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,800
Cost:
$20
$6,800 146,542 - - - - $6,800
146,542
kWh
-
-
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$470
Cost:
$100
$470 10,258 - - - - $470
10,258
kWh
-
-
MMBtu
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,410
Cost:
$100
- - $2,410 1,071 - - -
-
kWh
$2,410
1,071
MMBtu
-
-
$
04: 2.7314 REDUCE VENTILATION AIR Savings:
$4,140
Cost:
$1,200
$440 17,585 $3,700 1,643 - - $440
17,585
kWh
$3,700
1,643
MMBtu
-
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,350
Cost:
$800
$1,350 29,015 - - - - $1,350
29,015
kWh
-
-
MMBtu
-
-
$
06: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$1,040
Cost:
$250
- - - - $1,040 - -
-
kWh
-
-
MMBtu
$1,040
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$400
Cost:
$440
$450 9,672 $(-50) (-21) - - $450
9,672
kWh
$(-50)
(-21)
MMBtu
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,520
Cost:
$2,220
- - $2,520 1,120 - - -
-
kWh
$2,520
1,120
MMBtu
-
-
$
09: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$790
Cost:
$900
$170 7,034 $620 275 - - $170
7,034
kWh
$620
275
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,250
Cost:
$7,800
$6,250 134,525 - - - - $6,250
134,525
kWh
-
-
MMBtu
-
-
$
11: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$12,430
Cost:
$16,710
$12,430 267,585 - - - - $12,430
267,585
kWh
-
-
MMBtu
-
-
$
12: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,150
Cost:
$12,000
$9,150 196,952 - - - - $9,150
196,952
kWh
-
-
MMBtu
-
-
$
13: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$9,380
Cost:
$13,860
$9,380 201,934 - - - - $9,380
201,934
kWh
-
-
MMBtu
-
-
$
14: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,800
Cost:
$6,820
$1,800 38,687 - - - - $1,800
38,687
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$58,930
Cost:
$63,220
$48,690 1,059,789 $9,200 4,088 $1,040 - $48,690
1,059,789
kWh
$9,200
4,088
MMBtu
$1,040
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes