IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,101

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0124 # 03 Y:1988 03 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $280 $455 Implemented
MA0124 # 04 Y:1988 04 1988 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $455 $720 Not Implemented
MA0124 # 05 Y:1988 05 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $586 $109 Implemented
MA0124 # 06 Y:1988 06 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,993 $935 Implemented
MA0124 # 07 Y:1988 07 1988 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $677 $100 Implemented
MA0124 # 08 Y:1988 08 1988 RECOVER WASTE HEAT FROM EQUIPMENT $10,065 $28,770 Not Implemented
KU0262 # 01 Y:1988 01 1988 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $7,388 $500 Implemented
KU0262 # 02 Y:1988 02 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,150 $250 Implemented
KU0262 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,009 $150 Implemented
KU0262 # 04 Y:1988 04 1988 INSTALL AUTOMATIC STACK DAMPER $340 $300 Not Implemented
KU0262 # 05 Y:1988 05 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $241 $400 Implemented
KU0263 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,737 $5,000 Implemented
KU0263 # 02 Y:1988 02 1988 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,188 $4,000 Not Implemented
KU0263 # 03 Y:1988 03 1988 RECOVER WASTE HEAT FROM EQUIPMENT $1,211 $1,600 Implemented
KU0263 # 04 Y:1988 04 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,486 $1,308 Implemented
KU0263 # 05 Y:1988 05 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $219 $0 Implemented
KU0263 # 06 Y:1988 06 1988 SHUT OFF PILOTS IN STANDBY EQUIPMENT $187 $0 Implemented
KU0263 # 07 Y:1988 07 1988 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $269 $0 Implemented
KU0263 # 08 Y:1988 08 1988 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $108 $0 Not Implemented
KU0263 # 09 Y:1988 09 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $610 $920 Not Implemented
WI0041 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $7,141 $0 Implemented
WI0041 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,945 $0 Implemented
WI0041 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,418 $11,967 Implemented
WI0041 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $750 $1,000 Implemented
WI0041 # 05 Y:1988 05 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $168 $500 Implemented