IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,112

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0112 # 01 Y:2001 01 2001 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $477,641 $1,116,799 Not Implemented
LL0112 # 02 Y:2001 02 2001 BURN A LESS EXPENSIVE GRADE OF FUEL $1,598,858 $154,800 Not Implemented
LL0112 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,154 $1,200 Implemented
LL0112 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $5,437 $9,810 Implemented
LL0112 # 05 Y:2001 05 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $353,891 $50,860 Implemented
LL0112 # 06 Y:2001 06 2001 USE PHOTOCELL CONTROLS $109,215 $1,962 Not Implemented
UD0626 # 01 Y:2001 01 2001 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $49,350 $4,680 Not Implemented
UD0626 # 02 Y:2001 02 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,653 $0 Implemented
UD0626 # 03 Y:2001 03 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,326 $1,000 Implemented
UD0626 # 04 Y:2001 04 2001 ADJUST VENTS TO MINIMIZE ENERGY USE $2,451 $112 Implemented
UD0626 # 05 Y:2001 05 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,173 $364 Implemented
UD0626 # 06 Y:2001 06 2001 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,158 $1,050 Implemented
UD0626 # 07 Y:2001 07 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,847 $42 Implemented
UD0626 # 08 Y:2001 08 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,587 $423 Implemented
UD0626 # 09 Y:2001 09 2001 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $860 $250 Implemented
UD0626 # 10 Y:2001 10 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $580 $2,526 Implemented
UD0626 # 11 Y:2001 11 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $514 $0 Not Implemented
IA0266 # 01 Y:2001 01 2001 RECOVER WASTE HEAT FROM EQUIPMENT $26,215 $35,700 Not Implemented
IA0266 # 02 Y:2001 02 2001 REDUCE VENTILATION AIR $12,703 $5,038 Not Implemented
IA0266 # 03 Y:2001 03 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,737 $0 Implemented
IA0266 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,175 $11,846 Implemented
IA0266 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,933 $0 Not Implemented
IA0266 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $2,034 $1,663 Implemented
IA0266 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $1,804 $5,398 Not Implemented
IA0266 # 08 Y:2001 08 2001 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,440 $3,410 Not Implemented