IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,112

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0193 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,216 $2,350 Implemented
UF0193 # 06 Y:1998 06 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $359 $661 Implemented
UF0193 # 07 Y:1998 07 1998 USE RADIANT HEATER FOR SPOT HEATING $18,876 $14,030 Not Implemented
UF0193 # 08 Y:1998 08 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,260 $1,000 Not Implemented
UF0193 # 09 Y:1998 09 1998 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $49,180 $0 Implemented
UF0193 # 10 Y:1998 10 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $6,029 $15,000 Not Implemented
TN0623 # 01 Y:1998 01 1998 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $140,000 $56,120 Not Implemented
TN0623 # 02 Y:1998 02 1998 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK $81,250 $2,400 Not Implemented
TN0623 # 03 Y:1998 03 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $77,680 $121,440 Implemented
TN0623 # 04 Y:1998 04 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $52,045 $61,760 Implemented
TN0623 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $30,000 $16,200 Implemented
TN0623 # 06 Y:1998 06 1998 DISCONNECT BALLASTS $13,255 $900 Not Implemented
TN0623 # 07 Y:1998 07 1998 OPTIMIZE PLANT POWER FACTOR $9,920 $16,200 Not Implemented
TN0623 # 08 Y:1998 08 1998 INSULATE BARE EQUIPMENT $1,980 $380 Not Implemented
TN0623 # 09 Y:1998 09 1998 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,230 $0 Not Implemented
HO0165 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,288 $8,266 Implemented
HO0165 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $171 $510 Implemented
HO0165 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $949 $800 Not Implemented
HO0165 # 04 Y:1998 04 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,280 $6,500 Not Implemented
HO0165 # 05 Y:1998 05 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,900 $1,920 Not Implemented
MO0217 # 01 Y:1997 01 1997 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $46,952 $50,000 Implemented
MO0217 # 02 Y:1997 02 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $13,495 $3,500 Implemented
MO0217 # 03 Y:1997 03 1997 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $8,200 $20,000 Implemented
MO0217 # 04 Y:1997 04 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $7,350 $12,500 Implemented
MO0217 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,125 $8,080 Implemented