IAC logo
IAC Assessment: MO0228
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0228
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1998
Principal Product Various types of Envelopes
NAICS n/a
SIC 2677 - Envelopes
Sales $10,000,000-$50,000,000
# of Employees 275
Plant Area (Sq.Ft.) 101,000
Annual Production 2,147,483,647 Pieces
Production Hrs. Annual 6,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $316,804 6,802,755 kWh $0.05
Electricity Demand $30,292 1,220 kW-months/year $24.83
Electricity Fees $28,987 - $ -
Natural Gas $20,864 3,643 MMBtu $5.73
LPG $6,841 453 MMBtu $15.10
TOTAL ENERGY COSTS $541,848
RECOMMENDED SAVINGS* $162,762 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,812
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,820
Cost:
$3,700
- - - - - - $2,820 - -
-
kWh
-
-
kW-months/year
-
-
lb
$2,820
-
$
02: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$6,875
Cost:
$9,000
- - - - - - $6,875 - -
-
kWh
-
-
kW-months/year
-
-
lb
$6,875
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,275
Cost:
$5,648
$1,952 38,394 $323 13 - - - - $1,952
38,394
kWh
$323
13
kW-months/year
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$958
Cost:
$1,308
$834 16,413 $124 5 - - - - $834
16,413
kWh
$124
5
kW-months/year
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$129
Cost:
$207
$104 2,052 $25 1 - - - - $104
2,052
kWh
$25
1
kW-months/year
-
-
lb
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,303
Cost:
$128
$3,055 60,082 $248 10 - - - - $3,055
60,082
kWh
$248
10
kW-months/year
-
-
lb
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,051
Cost:
$6,765
$4,679 92,028 $372 15 - - - - $4,679
92,028
kWh
$372
15
kW-months/year
-
-
lb
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,276
Cost:
-
$1,177 23,154 $99 4 - - - - $1,177
23,154
kWh
$99
4
kW-months/year
-
-
lb
-
-
$
09: 3.1163 USE PLASTIC PALLETS INSTEAD OF WOOD Savings:
$138,000
Cost:
$129,420
- - - - $138,000 12,000 - - -
-
kWh
-
-
kW-months/year
$138,000
12,000
lb
-
-
$
10: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$2,075
Cost:
-
- - - - $2,075 2,964 - - -
-
kWh
-
-
kW-months/year
$2,075
2,964
lb
-
-
$
TOTAL RECOMMENDED Savings:
$162,762
Cost:
$156,176
$11,801 232,123 $1,191 48 $140,075 14,964 $9,695 - $11,801
232,123
kWh
$1,191
48
kW-months/year
$140,075
14,964
lb
$9,695
-
$
TOTAL IMPLEMENTED Savings:
$15,812
Cost:
$17,756
$11,801 232,123 $1,191 48 - - $2,820 - $11,801
232,123
kWh
$1,191
48
kW-months/year
-
-
lb
$2,820
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost