IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0070 # 01 Y:2011 01 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $136,635 $120,000 Implemented
DL0070 # 10 Y:2011 10 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $33,730 $1,035,000 Not Implemented
DL0070 # 07 Y:2011 07 2011 USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING $4,600 $10,000 Not Implemented
DL0070 # 02 Y:2011 02 2011 REDUCE VENTILATION AIR $12,200 $200 Implemented
DL0070 # 03 Y:2011 03 2011 REDUCE VENTILATION AIR $2,160 $45 Not Implemented
DL0070 # 06 Y:2011 06 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $104,177 $157,000 Implemented
DL0070 # 08 Y:2011 08 2011 MODERATE COOLING TOWER OUTLET TEMPERATURE $21,528 $52,000 Implemented
DL0070 # 04 Y:2011 04 2011 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $14,330 $500 Implemented
DL0070 # 09 Y:2011 09 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,701 $10,500 Not Implemented
DL0070 # 05 Y:2011 05 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,782 $1,800 Not Implemented
DL0032 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,639 $31,781 Implemented
DL0032 # 08 Y:2008 08 2008 USE MINIMUM STEAM OPERATING PRESSURE $2,065 $0 Implemented
DL0032 # 07 Y:2008 07 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,521 $643 Implemented
DL0032 # 06 Y:2008 06 2008 REPLACE BOILER $6,100 $6,100 Implemented
DL0032 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $8,400 $7,500 Implemented
DL0032 # 03 Y:2008 03 2008 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $12,400 $7,000 Not Implemented
DL0032 # 02 Y:2008 02 2008 REDUCE VENTILATION AIR $19,700 $1,200 Implemented
DL0032 # 01 Y:2008 01 2008 REPLACE BOILER $30,400 $55,000 Not Implemented
RU0052 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,516 $2,000 Implemented
RU0052 # 02 Y:1989 02 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,753 $0 Not Implemented
RU0055 # 08 Y:1989 08 1989 OPTIMIZE PLANT POWER FACTOR $31,000 $13,500 Not Implemented
RU0055 # 06 Y:1989 06 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,303 $5,220 Implemented
RU0052 # 06 Y:1989 06 1989 REDUCE VENTILATION AIR $2,959 $2,200 Not Implemented
RU0052 # 07 Y:1989 07 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,620 $0 Implemented
RU0055 # 05 Y:1989 05 1989 RECOVER AND REUSE COOLING WATER $18,842 $0 Not Implemented