Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsSIC | 267 | Misc. Converted Paper Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0162 # 05 Y:2022 | 05 | 2022 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $45,478 | $37,072 | Implemented |
IP0162 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $634 | $152 | Implemented |
IP0162 # 06 Y:2022 | 06 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,589 | $8,000 | Not Implemented |
IP0162 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $923 | $2,186 | Implemented |
IP0162 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,724 | $1,255 | Implemented |
IP0162 # 04 Y:2022 | 04 | 2022 | INSTALL OCCUPANCY SENSORS | $377 | $137 | Implemented |
IP0162 # 01 Y:2022 | 01 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,109 | $12 | Implemented |
IP0056 # 13 Y:2016 | 13 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,149 | $51,579 | Not Implemented |
IP0056 # 06 Y:2016 | 06 | 2016 | APPLY FOR INVESTMENT INCENTIVES | $29,356 | $10,000 | Not Implemented |
IP0056 # 05 Y:2016 | 05 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,870 | $300 | Implemented |
IP0056 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,759 | $165 | Implemented |
IP0056 # 03 Y:2016 | 03 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,361 | $0 | Implemented |
IP0056 # 02 Y:2016 | 02 | 2016 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,368 | $0 | Implemented |
IP0056 # 01 Y:2016 | 01 | 2016 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,612 | $0 | Not Implemented |
IP0056 # 15 Y:2016 | 15 | 2016 | APPLY FOR INVESTMENT INCENTIVES | $1,896 | $5,000 | Not Implemented |
IP0056 # 07 Y:2016 | 07 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $356 | $170 | Not Implemented |
IP0056 # 08 Y:2016 | 08 | 2016 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,273 | $2,406 | Not Implemented |
IP0056 # 12 Y:2016 | 12 | 2016 | APPLY FOR INVESTMENT INCENTIVES | $5,810 | $5,000 | Not Implemented |
IP0056 # 14 Y:2016 | 14 | 2016 | OPTIMIZE PLANT POWER FACTOR | $14,198 | $22,745 | Not Implemented |
IP0056 # 09 Y:2016 | 09 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,909 | $1,267 | Not Implemented |
IP0056 # 11 Y:2016 | 11 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,064 | $6,597 | Not Implemented |
IP0056 # 10 Y:2016 | 10 | 2016 | INSTALL OCCUPANCY SENSORS | $311 | $218 | Implemented |
ND0301 # 07 Y:1998 | 07 | 1998 | ADD ADDITIONAL PRODUCTION SHIFT | $690,453 | $1,063,976 | n/a |
ND0301 # 06 Y:1998 | 06 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $30,940 | $24,000 | n/a |
ND0301 # 05 Y:1998 | 05 | 1998 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8 | $13 | n/a |